w Vacuum holding test
Hold the system at a pressure of
–755mmHg or lower for 1 hour or longer,
and confirm that the vacuum reading does
not rise on the vacuum gauge. If it rises,
moisture or leakage may exist in the
system. However, take care not to leak air
from the gauge manifold. If air enters, it is
recommended to use the cupper tube
directly instead of gauge manifold.
e Charging of refrigerant
After the vacuum-holding test, make the
circuit vacuous again for approx. 10
minutes. Then, charge the specified
amount of refrigerant through the service
port on the liquid line using the charging
cylinder.
qVacuum-dehydrating (first time)
..... 2 hours
wVacuum-breaking (first time)
Nitrogen gas is pressurized to 0.5kg/cm2
from the service port on suction pipe.
Since nitrogen gas breaks the vacuum, the
effect of the vacuum-dehydrating is
enhanced. However, if there is much
moisture, it can not be removed by this
method. Therefore, do not allow water
entry or produce water during the
refrigerant piping work.
eVacuum-dehydrating (second time)
Run the vacuum pump one hour or longer.
(The achievable vacuum must be
–755mmHg or lower.)
If pressure of –755mmHg or lower can not
be achieved even after vacuuming of 2
hours, repeat step wvacuum-breaking and
evacuum-dehydrating.
rVacuum holding test ..... 1 hour  Same as normal
 vacuumtAdditional charge of refrigerant 
dehydrating
Time chart of normal vacuum-dehydrating
+0.5kg/cm2
Positive
pressure
Atmospheric
pressure
0kg/cm2
Note: Make sure to use nitrogen gas for
vacuum-breaking. (If any oxygen gas is
used, it may explode.)
–200mmHg
Vaccume
–400mmHg
–600mmHg
–700mmHg
–760mmHg
Time chart of special vacuum-dehydrating
–755mmHg
+0.5kg/cm2
Addtional
pressure
Vacuum-dehydrating Vaccum
leaving
test
Charge of
refrigerant
Atmospheric
pressure
0kg/cm2
(2 hours) (1 hours)
Totally 3 hours
–200mmHg
[Special vacuum-dehydrating]
This method is that the vacuum-breaking
process with nitrogen gas is integrated
one time or more in the same way as the
normal vacuum-dehydrating process.
Vacuum
–400mmHg
–755
mmHg
Vacuum-holding
test 1 hour
Charge of refrigerant
–755
mmHg
Vacuum-dehydrating
2 hours
–700mmHg
–760mmHg
Vacuum-breaking
Vacuum-dehydrating
1 hour
–600mmHg
Totally 4 hours
(1mmHg=0.0013kg/cm2=0.133Kpa)
4-23