Download 6 - Yamaha XJR
Transcript
CABLE ROUTING B Secure the carburetor heater lead wire, the starter motor cable, the negative (–) lead wire of the battery, the A.C. generator lead wire, the neutral lead wire, the side stand switch lead wire, the pickup lead wire, and the rear stop switch lead wire (total 8 wires), to the fuel tank rail, near the air cleaner intake port mounting screw, by use of this band. The front end of the band must be directed towards the front of the vehicle. C Clamp the throttle cables to the fuel tank rail, on the tank fitting by use of this band. The front end of the band must be directed downward. D Thread this clamp through the upper hole in the gusset and secure the two throttle cables. The front end of the clamp must be directed towards the inside of the vehicle. 10 SPEC E Bundle the #3 and #4 high-tension cords, on the head cover mounting bolt at the #3 cord, by use of this band. F Do not entangle the lead wires and the hosing. Pass the bundle of lead wires and that of hosing orderly as shown. G Pass the air cleaner drain hose, the fuel tank drain hose, and the fuel tank breather hose (total 3 hoses) through the guide wire of the engine.