2 - ELECTRICAL CONNECTIONS
TRANSDUCER/POWER CONNECTIONS
1) Route the transducer cables from the transducer mounting location back to the DTFX Ultra enclosure. Connect the transducer wires to the terminal block in the DTFX Ultra enclosure.
Downstream+
DownstreamUpstreamUpstream+
2) Verify that power supply is correct for the meters
power option.
Line voltage AC units require 95 to 265 VAC
47 to 63 Hz @ 17 VA maximum.
Low voltage AC units require 20 to 28 VAC
47 to 63 Hz @ 0.35 A maximum.
FIGURE Q.2 - TRANSDUCER CONNECTIONS
DC units require 10 to 28 VDC @ 5 Watts maximum.
3) Connect power to the DTFX Ultra flow meter.
3 - PIPE PREPARATION AND TRANSDUCER MOUNTING
(DTTN, DTTL, and DTTH Transducers)
1) Place the flow meter in signal strength measuring mode. This value is available on the DTFX Ultra
display (Service Menu) or in the data display of the software utility.
2) The pipe surface, where the transducers are to be mounted, must be clean and dry. Remove scale,
rust or loose paint to ensure satisfactory acoustic conduction. Wire brushing the rough surfaces
of pipes to smooth bare metal may also be useful. Plastic pipes do not require preparation other
than cleaning.
3) Apply a single ½” (12 mm) bead of acoustic couplant grease to the upstream transducer and
secure it to the pipe with a mounting strap.
4) Apply acoustic couplant grease to the downstream transducer and press it onto the pipe using
hand pressure at the lineal distance calculated in Step 1.
5) Space the transducers according to the recommended values found during programming or from
the software utility. Secure the transducers with the mounting straps at these locations.
06-TTM-UM-00006 10/2011