Download User Manual - SynergyMMS

Transcript
SynergyMMS: Preventive Maintenance
The list on the right of the PMoD form contains all the Equipment PMs available within
SynergyMMS based on User Rights. The Equipment PM list displays the following
columns:
 Name – The Name of the Equipment PM Schedule
 Last Opened – The last date the PM was generated for the selected
Equipment
 Last Completed – The last date the PM was completed for the selected
Equipment
 Next Generate – Contains one of the following indicators – a date when the
PM is next scheduled for the currently selected Equipment; an indicator how
many days the PM is past due to generate; PMs not connected to the selected
Equipment display Not Connected
© Copyright Systems Associates, Inc. 2005-2012
Page 5-18