Download User Manual - SynergyMMS
Transcript
SynergyMMS: Preventive Maintenance The list on the right of the PMoD form contains all the Equipment PMs available within SynergyMMS based on User Rights. The Equipment PM list displays the following columns: Name – The Name of the Equipment PM Schedule Last Opened – The last date the PM was generated for the selected Equipment Last Completed – The last date the PM was completed for the selected Equipment Next Generate – Contains one of the following indicators – a date when the PM is next scheduled for the currently selected Equipment; an indicator how many days the PM is past due to generate; PMs not connected to the selected Equipment display Not Connected © Copyright Systems Associates, Inc. 2005-2012 Page 5-18