Transcript
Electrical Considerations of Seismic Installation Figure 6 Electrical wiring—seismic considerations Factory-installed Unit Disconnect Switch (optional) Field-supplied disconnect switch when factoryinstalled unit disconnect switch is not provided Monitoring Panel Three-phase electrical and low-voltage connections not by Emerson Seismic Compensation Flexible conduit and conductors must be provided to allow the unit to move in three dimensions during a seismic event. The flexible conduit must have at least one bend between the rigid connection at the unit cabinet and the connection to the rigid conduit or foundation. Liebert® DSE™ IBC Seismic Supplement 16 DPN002538 Pg. 8, Rev. 2