Download USERS MANUAL
Transcript
SHOULDER STOCK INSTALLATION #325 I>EKB:;HIJE9A #332 #16 SHOULDER STOCK INSTALLATION Place the Shoulder Stock (#332) on the back end upper section of the Receiver (#325). Once the Shoulder Stock is in place tighten the Set Screw (#16) to secure the stock to the body of the marker. The Set Screw (#16) is located on the right side of the receiver. ADJUSTING SHOULDER STOCK LENGTH * Turning the Shoulder Stock Screw (#333) counter-clockwise will loosen the Shoulder Stock allowing for three different lengths to be achieved. * Not Pictured. 10