Download User manual - SupplyHouse.com

Transcript
7 747 000 510 – 07/2006 US
User manual
Gas Boiler
Logano GC124 II/SP
WARNING!
If the information in this manual is not followed exactly, a fire or explosion may
result causing property damage, personal injury or loss of life.
z Do not store or use gasoline or other
flammable vapors and liquids in the
vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS!
z Do not try to light any appliance.
z Do not touch any electrical switch; do
not use any phone in your building.
z Immediately call your gas supplier
from a neighbor’s phone. Follow the
gas supplier’s instructions.
z If you cannot reach your gas supplier,
call the Fire Department.
z Installation and service must be performed by a qualified installer, service
agency or gas supplier.
NOTICE: This manual must be retained for future reference.
Please read thoroughly before use.
For the user
1
1
For your Safety
For your Safety
The Logano GC124 II/SP atmospheric gas boiler has
been designed and constructed using the newest technology available. User friendliness was taken into account during the design process. Following the safety
references and operating instructions will take advantage of the economical and environmentally friendly design of your boiler.
1.1
WARNING!
WARNING!
z Prevent spark formation. Do not
operate electrical switches, including
telephones, plugs or door bells.
z Close main gas valve.
RISK TO LIFE
z Open doors and windows.
Identifies possible dangers originating
from the product, which might lead to serious injury or death if proper care is not
taken.
z Warn other occupants of the building,
but do not use door bells.
RISK OF INJURY/
SYSTEM DAMAGE
Identifies potentially dangerous situations,
which might lead to medium or minor
injuries or to material losses if proper
caution is not followed.
z Leave the building.
z Call gas company and fire department
from outside the building.
1.3.1 Information on the boiler room
RISK TO LIFE
due to poisoning.
WARNING!
USER NOTE
Insufficient ventilation or combustion air
availability may cause dangerous flue gas
leaks or formation.
z Make sure that inlets and outlets are
not reduced in size or closed.
Guidelines for the optimum use and setting of the control(s) plus other useful information.
1.3
z If you smell gas there is a danger of
explosion.
z No open flame! No smoking.
Symbols for identification of dangers and user instructions:
CAUTION!
z Never put yourself at risk. Your own
safety must always take priority.
from explosion of flammable gases.
Observe the following symbols
WARNING!
due to neglecting your own safety in case
of emergency, such as with a fire.
RISK TO LIFE
Correct Use
The Logano GC124 II/SP atmospheric gas boiler is designed to heat water for a hot water heating system for
heating single or multiple occupancy buildings.
1.2
RISK TO LIFE
z If faults are not corrected immediately,
the boiler must not be operated until all
faults have been corrected.
Observe the following guidelines
Property damage may occur if the boiler is not used
properly.
z Do not operate the boiler if damage is present.
z Have the heating system installed by a qualified installer, service agency or gas supplier.
z Have the installer explain the operation of the heating
system.
FIRE DANGER
due to flammable materials or liquids.
WARNING!
z Make sure that there are no flammable
materials or liquids in the immediate
vicinity of the boiler.
z Maintain a minimum distance of
15 inches from the boiler.
z Read this user manual thoroughly.
We reserve the right to make any changes due to technical modifications.
2
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
For your Safety
1
RISK TO LIFE
due to water damage.
WARNING!
z Do not use the boiler if any part has
been submerged in water.
z Contact a qualified service technician
to check and replace any components
submerged in water.
SYSTEM DAMAGE
due to freeze.
CAUTION!
z Make sure the boiler room stays
above freezing.
1.3.2 Performing work on the heating system
RISK TO LIFE
from explosion of flammable gases.
WARNING!
z Make sure that a qualified company installs the boiler, connects gas and
venting connections, places the boiler
in operation, connects the electrical
power, and maintains and repairs the
boiler.
Other important information!
z Do not use this boiler if any part has been under water. Immediately call a qualified service technician to
inspect the boiler and to replace any part of the control system and any gas control which has been under water.
z Should overheating occur or the gas supply fail to
shut off, do not turn off or disconnect the electrical
supply to the pump. Instead shut off the gas supply
at a location external to the boiler.
z The venting system must be inspected yearly. Replace any parts that show signs of deterioration from
corrosion or any other sources.
z The boiler must be inspected yearly by a qualified
service agency. The inspection must include the
main burners, pilot burner, boiler flue, vent collector
and venting system. Replace any parts that show
signs of deformation from corrosion or other sources.
We reserve the right to make any changes due to technical modifications.
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
3
2
2
Product description
Product description
The GC124 II and SP model boilers are low temperature
atmospheric gas-fired boilers.
GC124 II
The boilers consist of:
– Ignition module (only for GC124 II model) and Honeywell aquastat
1
– Boiler jacket and front door
2
– Boiler block with insulation
– Gas burner
3
The ignition module and aquastat monitor and control all
electrical components of the boiler.
6
The boiler jacket prevents energy loss and acts as
soundproofing.
4
The boiler block transfers the heat generated by the
burner to the boiler water. The insulation prevents energy loss.
5
GC124 SP
1
2
6
4
5
7 747 000 511-01.0K
Fig. 1
1
2
3
4
5
6
Logano GC124 II and SP boiler
Boiler front door
Aquastat (boiler temperature control)
Ignition module (only for GC124 II model)
Boiler block with insulation
Gas burner
Boiler jacket
We reserve the right to make any changes due to technical modifications.
4
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
Start-up instructions
3
3
Start-up instructions
Read the instructions and warnings on Î page 2
before start-up for your safety.
RISK TO LIFE
WARNING!
due to not observing the start-up instructions and resulting incorrect operation.
z If these instructions are not followed exactly, a fire or explosion may be caused
with serious property damage or loss of
life or serious injury.
z Observe the start-up instructions.
USER NOTICE
GC124 II only:
This boiler is equipped with an electronic
ignition system which automatically will
light the pilot burner. Do not try to
maunally light the pilot burner.
GC124 SP only:
This boiler is equipped with a pilot burner
that must be lit by hand. Please follow the
instructions in Î Chapter 3.2, page 7,
when lighting the pilot burner.
We reserve the right to make any changes due to technical modifications.
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
5
3
3.1
Start-up instructions
Operating instructions for GC124 II models
STOP! First read the safety instructions onÎ page 2
start-up warnings on Î page 5 of these instructions
1. Set thermostat to the lowest value.
2. Disconnect the heating system from the power
supply.
3. Shut off main gas supply.
4. Open the boiler front door.
RISK TO LIFE
Due to fire or explosion.
WARNING!
z Never use excessive force, when adjusting the gas control knob
(Î Fig. 3).
z Adjust the gas control knob only by
hand.
z Never use a tool for adjusting the gas
control knob.
Fig. 2
Removing front door of boiler
z If you can not turn the gas control knob
by hand, do NOT try to repair it.
z Contact a qualified service organization at this point.
5. Turn the gas control knob clockwise in the "OFF"
position. Do not use excessive force.
RISK OF LIFE
due to ignition of flammable gases.
WARNING!
z Wait 5 (five) minutes until all gas odors
have disappeared. Check to see if any
gas odors remain, also at floor level. In
case gas odors are still present, shut off
gas supply, shut electrical power to the
boiler and inform the service organization or local gas utility company.
1
6. If you do not smell any gases, proceed to the next
step.
Fig. 3
1
Gas valve
Gas control knob (shown in the "ON" position)
We reserve the right to make any changes due to technical modifications.
6
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
Start-up instructions
3
USER NOTE
This unit is equipped with an automatic ignition system which automatically starts
the pilot burner. Do not attempt to ignite it
manually.
7. Turn gas control knob counterclockwise to ON
position. Do not use force.
8. Close boiler front door.
9. Open main gas supply.
10. Turn on electric power to heating system.
11. Set thermostat to desired room temperature.
12. If the heating system does not start operating, follow
the instructions for turning off gas supply to boiler
(Î Chapter 3.3, page 10) and inform your customer
service technician or your gas company.
3.2
Operating instructions for GC124 SP models
STOP! First read the safety instructions onÎ page 2
start-up warnings on Î page 5 of these instructions
1. Set thermostat to the lowest value.
2. Disconnect the heating system from the power
supply.
3. Shut off main gas supply.
4. Open boiler front door.
Fig. 4
Removing front door of boiler
We reserve the right to make any changes due to technical modifications.
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
7
3
Start-up instructions
RISK OF LIFE
Due to fire or explosion.
WARNING!
z Never use excessive force, when adjusting the gas control knob
(Î Fig. 5).
z Adjust the gas control knob only by
hand.
z Never use a tool for adjusting the gas
control knob.
z If you can not turn the gas control knob
by hand, do NOT try to repair it.
z Contact a qualified service organization at this point.
5. Turn the gas control knob clockwise in the "OFF"
position. Do not use excessive force.
3
RISK OF LIFE
Due to ignition of flammable gases.
WARNING!
z Wait 5 (five) minutes until all gas odors
have disappeared. Check to see if any
gas odors remain, also at floor level. In
case gas odors are still present, shut off
gas supply, shut electrical power to the
boiler and inform the service organization or local gas utility company.
2
1
6. If you do not smell any gases, proceed to the next
step.
7. Open main gas supply.
USER NOTE
This unit is equipped with an pilot burner
that must be ignited manually. Follow the
instructions below to light the pilot burner.
Fig. 5
1
2
3
Gasarmatur GC124 SP
Gas control knob (shown in the "ON" position)
"PILOT" position
Red pilot ignition button
8. Turn gas control knob (Î Fig. 5) clockwise to the
PILOT position.
9. Push and hold the red pilot ignition button (Î Fig. 5)
in.
We reserve the right to make any changes due to technical modifications.
8
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
Start-up instructions
3
10. Light the pilot burner with a match using the
furnished match holder. Insert the lit match through
the sight glass (Î Fig. 6).
11. After lighting the pilot, keep the red pilot ignition
button pressed in for an additional minute
(Î Fig. 7).
12. Release red pilot ignition button (Î Fig. 7). The red
pilot ignition button should move back and the pilot
burner should remain lit. If the pilot burner shuts off,
turn the gas control knob back to "OFF", and shut off
the main gas supply. Power done the heating
system and contact your heating service contractor
or gas utility company.
1
RISK TO LIFE
due to poisoning by leaking gas.
WARNING!
If the red pilot ignition button does not pop
up when you release it, you must proceed
with the following steps:
Fig. 6
1
GC124 SP boiler
Sight glass
z When the pilot burner shuts off after repeated lighting attempts, you must shut
off the gas control knob to "OFF" to
avoid spillage of gas.
z Shut off main gas supply.
z Contact your service technician or gas
supplier immediately and have the fault
repaired.
13. Turn gas control knob (Î Fig. 7) counterclockwise
to ON position. The gas control knob can only be set
to ON if the red pilot ignition button is out (Î Fig. 7).
2
14. Close boiler front panel.
15. Open main gas supply.
16. Turn on electric power to heating system.
17. Set thermostat to desired room temperature.
18. If the heating system does not start operating, follow
the instructions for "switching off gas supply to
boiler" (Î Chapter 3.3, page 10) and inform your
customer service technician or your gas company.
1
Fig. 7
1
2
GC124 SP gas valve
Gas control knob (shown in the "ON" position)
Red pilot ignition button
We reserve the right to make any changes due to technical modifications.
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
9
3
3.3
Start-up instructions
Shutting off gas supply to boiler
1. Set thermostat (optional) to the lowest value.
2. Disconnect heating system from the power supply
before carrying out maintenance work.
3. Open boiler front door.
Fig. 8
Open boiler front door
4. Turn gas control knob clockwise to the OFF position.
Do not use excessive force.
5. If necessary, shut off main gas supply.
6. Close boiler front door.
Flame roll-out switch
The boiler is equipped with a flame roll-out switch. If the
venting system of the boiler is blocked, the flame roll-out
switch will respond. Do not try to turn on the boiler. Inform a qualified service company. The venting system of
the boiler must be checked for blockage and the flame
roll-out switch must be replaced. The flame roll-out
switch is for one-time use only. Do not try to use it again.
1
1
Fig. 9
1
Gas valve (GC124 II left, GC124 SP right)
Gas control knob (shown in the "ON" position)
We reserve the right to make any changes due to technical modifications.
10
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
Taking the heating system out of operation
4
4
Taking the heating system out of operation
4.1
Normal system shut-down
1. Turn ON/OFF switch (emergency shutoff switch) to
OFF position. This shuts off power to the boiler and
all of its components (e.g. burner, aquastat).
2. Close gas shut off.
SYSTEM DAMAGE
due to freezing.
CAUTION!
The heating system can freeze up in cold
weather if it is shut down.
z Leave the heating system switched ON
constantly as much as possible.
z Protect the heating system from freezing
by draining the boiler and water pipes at
the lowest point.
4.2
1
Fig. 10
1
System shut-down
ON/OFF switch (emergency shut off switch)
Emergency shut-down procedures
Perform this procedure in case of emergency:
1. Never put yourself at risk. Your own safety must
always take priority.
2. Shut off main gas supply.
3. Shut down the heating system using the boiler
emergency shutoff switch or the corresponding
circuit-breaker.
We reserve the right to make any changes due to technical modifications.
User manual Gas Boiler Logano GC124 II/SP • Issue 07/2006
11
Your installer:
BBT North America Corporation - Bosch Group
50 Wentworth Ave
Londonderry, New Hampshire 03053 USA
Tel: (603) 552-1100/800-Buderus Fax: (603) 421-2719
www.buderus.net
BBT Thermotechnik GmbH, D-35573 Wetzlar
www.heiztechnik.buderus.de
info@heiztechnik.buderus.de