Download Eclipse 100 Installation & User Instructions
Transcript
Installation Instructions 5.34 The 50mm gap allows the air to circulate into the enclosure and cool the appliance, see Diagram 33. 33 5.37 Line the sides of the tile bracket up with the edges of the Eclipse outer casing, see Diagram 36. 36 Non-combustible Board Ventilation gaps 5.35 It will be necessary to provide gas to the underneath of the appliance. Cut a hole in the base in the position marked, see Diagram 34. 34 5.38 The rear folded return will sit on the top edges of the appliance below the flue exit. When correctly positioned the front lip of the bracket should be in line with the front face of the appliance and the bracket be level with the top of the airduct see Diagram 37. 37 Gas Pipe Entry Position 170mm 170mm 5.36 Fit the tile support bracket to the appliance before installation, see Diagram 35. 35 Front lip 5.39 Mark tile bracket fixing holes. 5.40 Remove the bracket and make holes with a 3mm Ø. 5.41 Replace the bracket and secure at each side with self tapping screws. 5.42 Place the appliance into position and level the feet on the platform with the adjustable screws on the base. IT IS VITAL TO ENSURE THE APPLIANCE HAS A 40MM CLEARANCE UNDERNEATH THE CASING TO ALLOW FOR AIR CIRCULATION, SEE DIAGRAM 38. 38 40mm 28