Download Manual 3 - ibuyer (HK)

Transcript
Factory Performance Report
This AQL rating compare chart can show the major and minor number of defect in average for every factory. When every
factory is line up together, quality control manager can see which factory got the best AQL average score.
Factory Overall Comparison Report
By dates delay compare chart is another important comparison chart. The above chart only compare base on the quality
control result of final inspection. (Use AQL – acceptance quality level, normal) but AQL result is not the only measure of a
factory’s performance. Delivery is also a very important consideration for their capability.
This chart will use the order minimum, lead-time, trade terms, product type as a compare. When you place an order with a
factory, a delivery date must be fixed, and usually your supplier will delay it. By taking an average of these dates, sampling,
order and inspection, re-inspection, re-inspection and so on. In addition to the AQL rating, delivery date compare, there is also
Page 31 of 37