Operating and service
instructions
VIESMANN
for contractors
Vitomax 200-HS
Type M73A
Oil/gas high pressure steam boiler
With or without economiser
Rated steam output 0.5 to 4.0 t/h
VITOMAX 200-HS
5607 288 GB
9/2011
Please keep safe.
Safety instructions
Safety instructions
Please follow these safety instructions closely to prevent accidents and material losses.
Danger
This symbol warns against the
risk of injury.
!
Please note
This symbol warns against the
risk of material losses and environmental pollution.
Note
Details identified by the word "Note" contain additional information.
Target group
These instructions are exclusively
designed for qualified personnel.
■ Work on gas installations must only be
carried out by a registered gas fitter.
■ Work on electrical equipment must
only be carried out by a qualified electrician.
■ The system must be commissioned by
Viessmann Industrieservice, the system installer or a qualified person
authorised by the installer.
Regulations
Observe the following when working on
this system
■ All legal instructions regarding the prevention of accidents
■ All legal instructions regarding environmental protection
■ Health and Safety at Work Act (BetrSichV) [Germany]
2
■ The Code of Practice of relevant trade
associations
■ Directive 97/23/EC, as well as the relevant safety regulations of the following countries
d DVGW, TRGI, TRF and VDE,
TRD
a KG, ABV, LRG-K, LRV-K, DKBG
c SEV, SUVA, SVGW, SVTI,
SWKI, VKF and EKAS guideline
1942: LPG, part 2
If you notice oil leaks and the smell of
gas
Danger
Escaping fuel can lead to explosions which may result in very
serious injuries.
■ Do not smoke. Prevent naked
flames and sparks. Do not
switch lights or electrical appliances on or off.
■ Close the quick-acting fuel
valve and shut-off valve.
■ Open windows and doors.
■ Remove all people from the
danger zone.
■ Notify your gas or electricity
supplier from outside the building.
■ Shut off the electricity supply to
the building from a safe place
(outside the building).
5607 288 GB
Safety instructions explained
Safety instructions
Safety instructions (cont.)
If you smell flue gas
Danger
Flue gas can lead to life-threatening poisoning.
■ Shutdown system.
■ Ventilate boiler room.
Repair work
!
Working on the system
■ Close the fuel shut-off valve and
secure against unintentional opening.
■ Isolate the system from the power supply and check that it is no longer 'live',
e.g. by removing the separate fuse or
by means of a main isolator.
■ Safeguard the system against unauthorised reconnection.
!
Auxiliary components, spare and
wearing parts
!
Please note
Electronic modules can be damaged by electrostatic discharges.
Before beginning work, touch
earthed objects, such as water
pipes, to discharge static loads.
Please note
Spare and wearing parts that
have not been tested together
with the system can compromise
its function. Installing non-authorised components and making
non-approved modifications or
conversions can compromise
safety and may invalidate our
warranty.
For replacements, use only original spare parts supplied or
approved by Viessmann.
Draining hot water
!
Please note
The blow-down and T.D.S. water
from boiler systems can reach
temperatures of 100 °C and
higher.
Set up the system so that this
water is cooled down to < 35 °C
prior to it entering the sewer system. Where necessary, refer to
the local water authority.
5607 288 GB
Danger
Risk of burning from hot surfaces
so that
■ steam line,
■ hot water line,
■ cleaning cover and closures/
plugs at the boiler system,
■ boiler doors, as well as components behind the doors,
can all become very hot. Observe
safety in the workplace!
Please note
Repairing components that fulfil a
safety function can compromise
the safe operation of your system.
Replace faulty components only
with original Viessmann spare
parts.
3
Safety instructions
Safety instructions (cont.)
Draining condensate from the flue
gas side
!
Please note
When the boiler system starts or
under certain conditions, condensate can form in the flues, the flue
gas collector and downstream in
the flue or chimney.
The system user must provide
suitable installations to safely
drain such condensate.
Subject to the regulations in the country
concerned, this condensate may need to
be neutralised. In such cases, consult
the local water authority or the relevant
body responsible for issuing permits.
Technical safety information
The boiler house must only be entered
by authorised personnel. Always keep
the boiler house clean, well lit and free
from all objects that do not belong there
and that might impair the operation. The
use of any part of the system as a drying
area is prohibited.
During operation, all required exits must
be left unlocked and free from obstructions. The operating personnel must log
all events, such as faults, adjustments,
consumption of spare parts and repairs.
A log must be maintained of all regular
readings of the control instruments.
5607 288 GB
Any damage to the boiler that could
lead to risks requires an immediate
boiler shutdown.
If major damage occurs at the boiler or
vessels, notify the authorising supervisory body without delay prior to carrying
out repairs.
Observe all technical safety instructions.
Steam generators require local permits
both for their installation and their operation. This permit must be available prior
to commissioning.
In the case of explosions, the user must
immediately notify the authorising supervisory body, irrespective of whether anyone was injured or not. Prior to the official
investigation, the status created by the
accident must not be changed apart from
what is necessary to prevent further
damage or as required for rescuing personnel.
4
Safety instructions
Technical safety information (cont.)
5607 288 GB
Obvious signs at weld seams, leaking
damaged areas, severe corrosion,
unusual characteristics of operating
instruments and system components as
well as unusual noise inside the boiler
must be notified immediately. Faults and
defects on the system that cannot be
remedied by experts locally must be notified to the manufacturer. Protect all
boiler parts and control equipment from
rain, water leaks and expelled steam.
Immediately repair all damage and
leaks.
Apart from the relevant legal requirements, all practical instructions issued by
our technical personnel to the operating
personnel are applicable.
It is impossible to clarify and describe all
potential cases of indicators and possible faults. These guidelines should
therefore, after a reasonable time in
operation, be supplemented based on
the experiences gained up to that point.
5
Index
Index
Operating instructions
Operating information
Storage of Vitomax boilers prior to installation as part of the system................... 7
Operating tips....................................................................................................... 7
Functions.............................................................................................................. 9
Shutting down the system.................................................................................... 17
Preservation......................................................................................................... 17
Maintenance instructions...................................................................................... 21
Service instructions
Water quality
Water quality for steam boiler systems................................................................ 22
Commissioning
Preamble.............................................................................................................. 31
Installation............................................................................................................ 31
Commissioning..................................................................................................... 33
Utilisation and operation
Monitoring............................................................................................................. 40
What to do in case of operating faults.................................................................. 41
Repairs and inspection
Repairs................................................................................................................. 42
Inspection............................................................................................................. 43
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance.......................................... 44
Further details regarding the individual steps....................................................... 45
Spare parts
Wearing parts, gaskets......................................................................................... 56
Appendix
Operating, maintenance and inspection tasks..................................................... 59
5607 288 GB
Keyword index.................................................................................................... 61
6
Operating information
Storage of Vitomax boilers prior to installation as part of the system
1. Vitomax boilers must be stored in
enclosed rooms, free from weather
influences under dry conditions.
2. The room temperature must not fall
below 0 °C nor exceed +50 °C.
3. In its delivered condition the boiler is
protected as standard on the water
side with dummy flanges or caps
against the ingress of foreign matter.
4. Remove the shipping packaging to
prevent the formation of condensate.
■ Check the effectiveness of the desiccant regularly. See the details provided by the desiccant manufacturer.
■ Ensure that the desiccant does not
come into contact with the boiler material (e.g. through suspended fixing).
■ Preserve the dry flue gas side with a
thin film of graphite or boiled oil.
■ Instead of the moisture extraction on
the flue gas side by means of a desiccant; a dryer with air circulation can
also be connected.
To prevent corrosion in the non-pressurised state, observe the following if the
boiler is stored for longer than 4 weeks:
■ Protect the interior of the boiler against
moisture on the flue gas side and on
the DHW side with a desiccant, e.g.
silica gel.
■ The amount of desiccant depends on
the boiler volume.
Operating tips
5607 288 GB
According to the Steam Boiler Order
[Germany], a steam boiler category IV
may only be taken into use when the relevant authority has granted permission
for the installation of the system, and an
authorised expert has tested the system.
According to the Steam Boiler Order
[Germany], steam boilers category IV
may only be operated, supervised and
maintained by a trained boilerman.
The approved inspection body may
grant, upon application, permission to
operate the boiler without supervision
subject to it being equipped in accordance with the TRD 604.
The system must be commissioned by
the Viessmann Industrieservice, the system installer or a qualified person authorised by the installer as well as the relevant expert.
Within 4 weeks of the combustion equipment being commissioned, the operator
must notify the local flue gas inspector
accordingly [check local regulations].
7
Operation
Please note:
This information applies to the storage prior to the system installation.
Operating information
Operating tips (cont.)
In systems comprising several boilers, of
which one is constantly used as standby
boiler, only change the operation over
after longer intervals, e.g. during the
annual inspection of the total system.
5607 288 GB
Record all actual values in a test report.
These must be confirmed by the installer, the relevant expert and the system
operator.
We would recommend that you operate
the boiler constantly at the required operating pressure. The operation of the
boiler at pressure will still be beneficial,
even if no heat demand occurs for a longer period of time.
8
Operating information
Functions
Installation drawing
qW qEqP qWqQ qR wQ wW
wP
3
wI
rP
qT
wU
wO
4
rT
6
rRrW rQ
rZ
wT wZ
rErR 1
wE
wR
5607 288 GB
2
5
Illustrative example. Order-specific deviations from the standard delivery are possi9
Operation
eQ
Operating information
Functions (cont.)
ble.
Note
Illustration of the fitting assembly refers to modulating operation. Provide two further
pressure regulators for stepped operation; the pressure transducer for the burner
control will then not be required.
1 Platform
2 Control panel
See separate documentation
3 Integral economiser
4 Connection line between economiser and boiler
5 Feedwater pump (module)
6 Burner
qP Level electrode
(WR – water level control)
qQ Level electrode
(HW – maximum water level)
qW Level electrode
(NW – minimum water level)
qE Accessory, flanged connection
DN 100
qR Accessory, flanged connection
DN 100
qT Conductivity electrode
wP Safety valve
wQ
wW
wE
wR
wT
wZ
wU
wI
wO
eQ
rP
rQ
rW
rE
rR
Air vent shut-off valve
Steam shut-off valve
Feedwater shut-off valve
Feedwater non-return valve
Blow-down shut-off valve
Blow-down valve
T.D.S. shut-off valve
T.D.S. valve
Mating flange DN 20
Air vent valve for economiser
Water level indicator
Pressure gauge
Maximum pressure limiter
Pressure transducer
Straight-through shut-off valve with
cap (option)
rT Dial thermometer
rZ Sampling cooler
5607 288 GB
In the following, selected components of
a steam boiler system are described. For
details, see the documentation provided
by the manufacturer of the individual
components.
10
Operating information
Functions (cont.)
Level electrodes qP to qW
Permanently modulating level monitoring qP
Level electrode for continual and load-dependent boiler filling
Operating information
The controller issues a pulse to the
feedwater control valve
Boiler is filled continually and subject to load
11
Operation
Method of operation
Continual water level con- Water level below or
trol comprising
exceeds the selec■ A level electrode
ted set value
■ An associated level
controller
Continual control of the
boiler water level via the
feedwater control valve
5607 288 GB
Function
Operating information
Functions (cont.)
Level monitoring water level "too high" (HW electrode qQ)
Level electrode to safeguard against maximum water levels
Function
Self-monitoring overfill protection
comprising
■ A level electrode
■ The associated evaluating device
Operating condition
Standard water
level
Water level too
high
The level drops
again
Operating information
Electrode is not
immersed in the conducting boiler water
and registers a high
resistance
Feedwater pump operation enabled
Feedwater pump runs
Boiler is filled continually and subject to load
Electrode is immersed
into the boiler water and
registers a low resistance
The feedwater pump is
stopped via the pump
relay
Feedwater supply to
the boiler interrupted
Feedwater pump can
start subject to
demand
5607 288 GB
Note
See also country-specific regulations.
12
Operating information
Functions (cont.)
Level monitoring water level "too low" (NW electrode qW)
Level electrode to safeguard against minimum water levels
Operating condition
Standard water
level
Operating information
Self-monitoring low water indicator
Electrode is immersed
comprising
into the conducting
■ Two level electrodes
boiler water and regis■ The associated evaluating devices
ters a low resistance
Safety chain closed
Burner operation enabled
Water level too low Electrode is out of the
boiler water and registers a high resistance
Safety chain and
burner operation constantly interrupted
The minimum boiler Re-enable safety chain
water content is
Burner block lifted
achieved again
Safety valve wP
Function
■ Physical protection of the boiler
against pressures in excess of the
max. permissible operating pressure
P1
■ Valve response pressure = max. permissible steam boiler operating pressure
■ Valve discharge capacity ≥ max.
steam output (boiler)
■ Pressure increase max. P1 plus 10%
with max. blow-off rating
■ Closing pressure at P1 minus 10 %
5607 288 GB
Testing/checks
Operating checks in regular intervals or
in accordance with country-specific
regulations
Operating information
Briefly cracking open by lifting the lever –
Do not release the lever.
Note the manufacturer’s operating instructions
Regular checking by an authorised con- Never remove the lead seal
tractor or test body
13
Operation
Function
Operating information
Functions (cont.)
Air vent shut-off valve wQ
Function
Venting the boiler
during filling or
after a new system start from
atmospheric
pressure
Operation
During heat-up,
open the valve and
close it again, as
soon as visible
steam is expelled
Operating information
Air / steam must be able to be routed away
safely
Steam shut-off valve wW
Function
Main boiler shutoff towards the
steam mains
Operation
Enable steam or
close boiler with
damper valves
Operating information
Open slowly to prevent water hammer
Blow-down wT and wZ
Function
■ Periodic removal of sludge deposits
Method of operation
Automatic blow-down via programmable valve at regular intervals
Manual blow-down at regular intervals
or in accordance with country-specific
regulations
14
Please note
When acting manually, be mindful of the lever kickback
5607 288 GB
!
Operating information
The programmable switch opens via the
control valve of the blow-down valve and
briefly drains off boiler water. The vacuum
force thus created removes the sludge from
the boiler
Manual activation possible at any time
Push the locking lever of the blow-down
valve to the side
Push down on the activating lever of the
blow-down valve for two to three seconds
Please note
When acting manually, be mindful of the
lever kickback
Operating information
Functions (cont.)
T.D.S. unit wU and wI
Function
■ Continual checking and regulation of
the salt content through temperaturecompensated conductivity electrode
■ Desalination via the TDS valve
■ Maintenance of specified limits by
opening and closing the valve
Operating information
Flow rate is reduced
Valve is opened further
Operation
Method of operation
Conductivity drops
Conductivity value exceeds the selected set value
Conductivity exceeds the highest
value
Safety chain is opened
Burner stops
Water level indicator rP
Function
■ Visual and direct water level indication
5607 288 GB
Method of operation
Visual water level check
Operating information
Valve on the steam and water side; shut-off
device OPEN
Flushing valve, shut-off device CLOSED
When there are no personnel present Keep valve CLOSED
Carry out operating checks at regular Close the valve on the water and steam
intervals or in accordance with country- side
specific regulations
Open blow-down valve, drain and check the
valve for tightness
Open the valve on the water side; check for
discharge noise
Close valve on the water side
Open the valve on the steam side; check for
discharge noise
Leave the valve on the steam side open
Close the flushing valve
Open valve on the water side
The water column rises quickly to the When the water column rises slowly, check
correct level
that there are no blockages
15
Operating information
Functions (cont.)
Pressure monitoring facility rQ to rR
Component
Function
The pressure monitoring unit is directly
connected to the
boiler via the fitting
assembly and comprises
■ Pressure gauge rQ Operating pressure
indicator
■ Pressure limiter rW Protection of the
boiler against overpressure when the
maximum pressure
is exceeded
Operating information
Operating checks at regular intervals
or in accordance with country-specific
regulations
Checking with a calibrated test pressure gauge by an authorised contractor or test body
Safety chain opened by opening a
contact in the pressure limiter
Burner stops
Safety chain reset by means of the
appropriate key in the control panel.
Reduce the boiler pressure via the air
vent valve or the main steam valve by
approx. 1 bar below the switching
point of the max. pressure limiter and
reset the max. pressure limiter
Burner starts again
■ Pressure transducer rE
5607 288 GB
■ Straight-through
shut-off valve with
cap rR
Load-dependent regulation of the boiler
combustion subject
to the operating pressure
Enables the replace- Exclusively by authorised contractors
ment of faulty components
16
Operating information
Functions (cont.)
Function
Operating information
Removal of water samples to carry out Values to be checked in accordance with
comparative tests
country-specific regulations and to be
recorded in the boiler log
■ pH value
■ Residual hardness
■ p value (value to determine the free alkalinity)
■ m value (value to determine the entire
alkalinity)
■ Phosphate
■ Sulphite
Shutting down the system
For short interruptions ≤ 3 days, maintain
the positive pressure in the boiler system
incl. all boiler-related drives (thermal
water treatment etc.). See also
page 38.
For longer interruptions, see chapter
"Preservation".
Preservation
To prevent corrosion setting in during
idle periods when the boiler is not pressurised, preserve the boiler surfaces on
the flue gas and water sides subject to
the length of the period during which the
boiler is taken out of use. There is a differentiation between wet preservation
during which exposure to oxygen is to be
avoided and dry preservation during
which moisture levels are to be minimised.
5607 288 GB
The procedures listed in the following
should be considered as preservation
options. Further procedures with alternative chemicals should be agreed with
their manufacturer. The basis of these
instructions is the VdTÜV datasheet
TC1465 "Preserving the water side of
steam boilers" [Germany].
17
Operation
Sampling cooler rZ
Operating information
Preservation (cont.)
Wet preservation
Never use this procedure where there
is a risk of frost.
Apart from the chemical wet preservation, physical-technical methods may
also be applied. With the wet preservation, the rapid boiler availability is an
advantage.
Preservation with sodium sulphite
For steam boilers, add the sodium sulphite in soluble form to the completely
drained steam boiler via the feedwater
pump. Fill the steam boiler completely.
Also fill any installed economisers. The
pH value should be between 11 and 12.
Keep all valves closed during the preservation process. The preservation solution should be circulated weekly. Initially, check the sulphite excess frequently, then at least once monthly.
When the content drops and falls below
the specified standard values, recirculate again and add agent, as required.
5607 288 GB
1. Fill the boiler incl. economiser (if
installed) up to the highest possible
level with treated feedwater. To prevent oxygen corrosion, add an oxygen
binder to the boiler water (e.g. sodium
sulphite) in accordance with the manufacturer's instructions. For this,
ensure good admixing with the boiler
water (thermal or mechanical agitation).
2. In multi boiler systems if only some
boilers must be preserved, these can
be filled with desalinated boiler water
from the boilers that remain in use.
This will also maintain the temperature. Ensure that the temperature
remains constant.
3. Maintaining pressure in a fully filled
boiler using nitrogen (preferably nitrogen 5.0) of 0.1 to 0.2 bar can prevent
boiler corrosion.
Chemical wet preservation chemically
binds the oxygen thereby protecting the
boiler material against corrosion. The
chemical wet preservation can be implemented when steam boilers are taken
out of use for short or longer periods.
An adequate amount of oxygen binders,
corresponding putrefaction by alkalis, a
thorough mixing of the preservation solution and complete filling of the boiler or
system, effectively prevent corrosion
due to idle periods whilst giving a great
deal of security with a reasonable
amount of effort and cost.
18
Operating information
Sodium sulphite excess
Idle time
Fill water for steam
boilers:
■ Water of low salt
content
■ Fully desalinated
water
■ Condensate
■ Water with salt
content
e.g. fully softened
water
or boiler water
Sodium sulphite content in the preservation solution mg
Na2So3/l
Additional sodium sulphite
Without
Crystalwater g/m3 lised g/m3
1 week
20 - 50
20 - 50
40 - 100
1 month
100 - 200
100 - 200
200 - 400
Longer
than 1
month
200 - 500
200 - 500
500 - 1000
1 week
40 - 100
40 - 100
80 - 100
5607 288 GB
Longer
400 - 1000
400 - 1000 800 - 2000
than 1
week
When using cold-prepared water which has not been deaerated, add an additional
80 g (without water) or 160 g (crystallised) sodium sulphite per m3.
Preservation with film forming
amines
Preservation through physical-technical measures
A wet preservation with film forming
amines is not permissible.
The following preservation steps through
physical-technical processes are also
possible, such as
■ Maintaining a positive steam pressure
in the boiler
■ Flow preservation of steam boilers.
These processes require system-specific equipment (valves, pipework,
pumps) and should be taken into consideration when designing the system.
Note
■ Observe all conditions for draining
waste water into sewer systems or into
the main discharge system when
draining the preserving solution.
■ When using the preserving agents,
observe the working instructions and
safety datasheets supplied by the
product manufacturer.
■ Also agree the steps for the preservation of the water side with the manufacturer of the preserving agent.
19
Operation
Preservation (cont.)
Operating information
Preservation (cont.)
Dry preservation
Note
This method is used when longer idle
periods are expected and to ensure protection against frost. This method means
that a quick return of the system into use
is not possible.
Complete drying out
After cooling down in the idle stage, the
boiler will be quickly drained at a pressure of approx. 3 bar. Observe the maximum permissible temperature for draining into the public sewage system.
Where required, catch the water in a collecting tank and drain it after it has
cooled down sufficiently.
Flush steam boilers with a high salt content in their boiler water (> 5 000 µS/cm)
once more on the water side. Afterwards,
open all man, head and hand holes.
Dry out components, such as economisers, separately.
Position desiccants (e.g. silica gel, blue
gel) in shallow bowls inside the open and
drying boiler or hang them inside the
boiler so that any contact with the boiler
material is safely prevented. Then close
the boiler. Check the desiccants at least
monthly. They should be replaced as
and when required.
Preservation with ammonia or nitrogen
These methods require extensive technical and technological effort. When
using these preserving methods, formulate system-specific operating instructions.
Preserving the hot gas side
After the boiler has been taken out of
use, clean the heating surfaces on their
hot gas side. The normal draught
ensures that the heating surfaces on the
hot gas side are adequately dried. Accelerate the process by means of a fan
heater; if required open the flue gas shutoff dampers for this process and then
close again.
It is recommended to treat the combustion chamber and the hot gas flues with
preserving oil (graphite or boiled oil).
This can be sprayed on or applied with a
brush. The boiler doors remain open.
20
Keep the surfaces dry during idle periods
(by adding a desiccant such as silica gel
or by air circulation via a connected
dryer).
A dry preservation is not recommended
under special installation conditions in
areas with high relative humidity (in the
tropics, near the sea).
5607 288 GB
Flue gas side
Operating information
Preservation (cont.)
Further details
For further details, see the VdTÜV datasheets (no. 1465, Oct. 1978) and the
VGB (no. R116H, 1981) [or local regulations].
Maintenance instructions
5607 288 GB
Operation
The TRD regulation specifies the maintenance of a steam boiler system, which
can be carried out by the Viessmann
Industrieservice or by an authorised contractor.
You can contact Viessmann Industrieservice on
Tel.: +49 (0)30/6602 389
Fax: +49 (0)30/6602 136
Email: Industrieservice@viessmann.com
Internet: www.viessmann-industriekessel.de/Industrieservice
21
Water quality
Water quality for steam boiler systems
Steam boilers
In its natural state, most untreated water
will be unsuitable as boiler feedwater.
The type of boiler feedwater treatment
should be matched to the raw water
quality. As its quality may change, regular checks are required.
The water feed pipe downstream of the
boiler feedwater treatment should be
equipped with a suitable water meter to
record the volume of top-up water added
to the return condensate; this also provides an indirect check on the steam
draw-off volume.
It is always advisable to return as much
condensate as possible to the feedwater
tank. The condensate may also have to
be treated so it conforms to the requirements of the boiler feedwater (according
to table 1).
These requirements, plus those of the
boiler water (according to table 2), mean
that – according to the raw water condition and the top-up water volume – at the
very least a suitable chemical or thermal
water treatment system must be installed, and there should be a facility for adding oxygen binders (possibly alkalines
and phosphates) into the feedwater tank
supply line.
The requirements are monitored by
measurements made by suitable, preferably uncomplicated devices (either
every 24 h or 72 h or in line with national
requirements, subject to operating
mode). These test values, the volume of
top-up water, the chemical consumption
and the required maintenance should be
entered into a boiler log to enable the
operating conditions to be checked at
any time.
Table 1: Saline boiler feedwater requirements
pH value at 25 °C
Conductivity at 25 °C
22
bar
µS/cm
> 0.5 < 20
> 20
Colourless, clear and free of undissolved substances
>9
>9
Only standard values applicable to boiler
water
5607 288 GB
Permiss. operating
pressure
General requirements
Water quality
Water quality for steam boiler systems (cont.)
Permiss. operating
pressure
Total alkaline earths
(Ca2+ + Mg2+)
Oxygen (O2)
Bound carbon dioxide
(CO2)
Iron, total (Fe)
Copper, total (Cu)
Oxidability (Mn VII →
Mn II) as KMnO4
Oil, grease
Organic substances
bar
> 0.5 < 20
mmol/litre
> 20
< 0.01
< 0.01
mg/l
mg/l
0.05
< 25
< 0.02
< 25
mg/l
mg/l
mg/l
< 0.2
< 0.05
< 10
< 0.1
< 0.01
< 10
mg/l
—
< 1
See comment*1
<1
Table 2: Boiler water requirements
*1
5607 288 GB
*2
*3
Feedwater conductivity ≤ 30 µS/cm
> 0.5
Colourless, clear and free of undissolved substances
10.5 to 12 10.5 to 11.8
10 to 11*2*3
1 to 12
1 to 10
0.1 to 1.0*2
< 6000
See Fig. 1,
page 25
< 1500
In general, organic substances are mixtures of different compounds. The constitution of such mixtures and the characteristics of their components when subjected
to boiler operating conditions are hard to predict. Organic substances can decompose into carbon dioxide and other acidic products that would increase the conductivity and result in corrosion and deposits. They can also lead to the formation
of foam and/or coatings that must be kept to the minimum levels possible. The
TOC content (Total Organic Carbon) should also be kept to a minimum.
When using demineralised water with a mixed bed quality (LF < 0.2 µS/cm) phosphate injection is not required; alternatively the AVT method (conditioning with
volatile alkalization agents, pH value of the feedwater ≥ 9.2 and pH value of the
boiler water ≥ 8.0) can be applied. In such cases, the conductivity downstream of
a severely acidic cation exchanger must be < 5 µS/cm.
Standard adjustment of the pH value through injection of Na3PO4; additional NaOH
injection only if the pH value is < 10.
23
Service
Permiss. oper- bar
ating pressure
General requirements
pH value at
25 °C
Acid capacity
mmol/litre
(KS 8.2)
Conductivity at µS/cm
25 °C
Feedwater conductivity >
30 µS/cm
> 0.5 to 20
> 20
Water quality
Water quality for steam boiler systems (cont.)
Permiss. oper- bar
ating pressure
Phosphate
mg/l
(PO4)
Silicic acid
mg/l
(SiO4)*4
Feedwater conductivity >
30 µS/cm
> 0.5 to 20
> 20
10 to 20
Feedwater conductivity ≤ 30 µS/cm
> 0.5
10 to 20
6 to 15
Pressure-dependent, see the diagrams on
pages 25 and 26
Note
The addition of phosphate is recommended, but is not always essential.
Conversion: 1 mol/m3 = 5.6 °dH; 1 °dH = 0.179 mol/m3; 1 mval/kg = 2.8 °dH
*4
If phosphate is used, higher PO4 concentrations are permissible, subject to consideration of all other values, e.g. with balanced or coordinated phosphate treatment. (See section "Conditioning")
24
5607 288 GB
Operation with salt-free boiler feedwater is also possible as an alternative to operation
with saline boiler feedwater.
Water quality
Water quality for steam boiler systems (cont.)
Maximum permissible direct boiler water conductivity, subject to pressure
Feedwater conductivity >30 μS/cm
10000
8000
2000
1000
0
10
Operating pressure in bar
20
30
40
5607 288 GB
Service
Direct conductivity in µS/cm
4000
25
Water quality
Water quality for steam boiler systems (cont.)
Maximum permissible boiler water silicic acid content (SiO2), subject to pressure
160
15 B
A
140
Silicic acid content (SiO2) in mg/l
120
100
80
10 B
5B
0.5B
60
40
20
0
10
Operating pressure in bar
20
30
40
A This level of alkalinity is no longer permissible >20 bar
B KS 8.2 - value in mmol/l
Conditioning
26
Conventional conditioning agents may,
for example, contain sodium and potassium hydroxide, sodium phosphate,
sodium sulphite, ammonia and diamide.
Note
In some countries or production processes, the use of some of these chemicals may be restricted.
5607 288 GB
Certain feedwater and boiler water characteristics must be improved through
chemical treatment.
This conditioning can contribute to:
■ Support for the formation of magnetic
layers or other protective oxidisation
layers
■ A reduction of corrosion through optimisation of the pH value
■ Stabilising the hardness and preventing or reducing scaling and deposits
■ Achieving chemical binding of residual
oxygen
Water quality
Water quality for steam boiler systems (cont.)
5607 288 GB
General information regarding conditioning
If organic conditioning agents are used,
the amounts and processes to be used
as well as the required analyses must be
specified by the supplier of these chemical products.
■ Oxygen and carbon dioxide or oxygen binders
Carbon dioxide and oxygen are expelled from the feedwater through full
thermal deaeration. The use of oxygen
binders is required if it proves impossible in practical use, e.g. through
repeated idle periods, to keep the oxygen content of the feedwater below the
permissible values. This "correcting
chemical" is admixed with the feedwater through the dosing facility.
Please note:
Amines that form a film are not oxygen
binders.
Note
In case of damage, evaporation can lead
to a concentration of the solute non-volatile boiler water constituents (salts,
solid conditioning agents). Such conditions can lead to local alkali concentrations that result in stress fracture corrosion. As a result, sodium hydroxide as
alkalization agent is only permissible in
slightly buffered feedwater with conductivity of <30 µS/cm, if the recommended
pH range cannot be achieved with
sodium phosphate alone. With this
method, sudden fluctuations in pH value
result in low sodium hydroxide content.
27
Service
■ Conductivity
– Saline
This means feedwater with electrical
conductivity of >30 µS/cm (e.g.
downstream of softening plants).
– Low salt content
This means feedwater with electrical
conductivity of 0.2-30 µS/cm (e.g.
downstream of desalination plants).
– Free of salt
This means feedwater with electrical
conductivity of <0.2 µS/cm and a silicic acid concentration of <0.02 mg/l,
as well as condensate with electrical
conductivity <5 µS/cm (e.g. downstream of full desalination plants
with mixed bed quality).
■ Acid capacity KS 8.2
A higher acid capacity in feedwater
would indicate an excess of bound carbon dioxide. This results in a higher
putrefaction by alkalis of the boiler
water, which leads to an increased risk
of corrosion on the steam boiler, and
also on the steam network downstream of the boiler through separation
of vapour-volatile carbon dioxide.
■ Adjusting the alkalinity
The selection of the alkalising agent
depends, amongst other things, on the
use of the steam, the steam pressure
and the type of water treatment. There
are solid and volatile alkalising agents.
A balanced conditioning with phosphate
or its derivatives can also be beneficial
through regulating the pH value of the
boiler water. However, organic conditioning agents have also been in use for
years.
Water quality
Water quality for steam boiler systems (cont.)
Deviation during conditioning
Actual values deviating during constant
operation from those specified may be
the result of the following:
■ Inadequate treatment of the top-up
water
■ Inadequate feedwater conditioning
■ Advancing corrosion on some system
components
■ Water contamination through ingress
of contaminants from other systems,
e.g. condensate tank, heat exchangers
Carry out immediate changes to reinstate the correct operation. For example,
feeding in returned condensate must not
influence the feedwater quality and may
have to be treated.
The chemical composition of the boiler
water can be monitored both by dosing
specific chemicals and by continuous or
intermittent blow-down of a part of the
water volume. This must be done in such
a way that solute as well as suspended
contaminants can be removed.
Conditioning/Warranty
Please note
The warranty will be void:
■ If film forming amines are used
■ If dosing agents are used that are not listed in the guidelines
Sampling
Sampling of water and steam from the
boiler system should comply with
ISO 5667-1 and the treatment and handling of samples should comply with
ISO 5667-3.
Samples are taken by means of a sampling cooler. This cools down the water
sample to a temperature of approx.
25 °C.
To be able to draw off a useful sample,
flush the sampling line for an appropriate
time.
The sample should be analysed immediately after drawing as values might
change as a result of prolonged settling.
Opaque or contaminated sample water
should be filtered prior to testing.
For this, see also the "Operating instructions of the sample cooler".
Provide sampling points at representative positions in the system.
Typical sampling points are:
28
■ Boiler feedwater entry valve
■ Boiler water from a downpipe or a continuous TDS line
5607 288 GB
Sampling points
Water quality
Water quality for steam boiler systems (cont.)
■ Top-up water downstream of the topup water treatment system or the storage tanks
■ Condensate at the condensate tank
outlet, if installed; otherwise draw the
sample off as near to the feedwater
tank as possible
Analysis
Note
For some types of water, the amount of
solute matter can be estimated by
means of the conductivity. In addition
there is a correlation between the pH
value and both conductivities.
Viessmann offers components for water
analysis to aid continual monitoring of
the O2 and pH values as well as water
hardness levels.
5607 288 GB
*5
*6
Analysis procedure/test equipment
In continuous boiler operation, the boiler
values can be checked adequately with
the test equipment. In the case of severe
deviations, confirm the actual values
through correspondingly standardised
analysis procedures to help remedy the
problem.
Parameters must be checked in accordance with the following standards:
Acid capacity
Conductivity
Copper
Iron
Oxygen
pH value
Phosphate
Potassium
Silicic acid*5
Sodium
TOC*6
Total hardness as
Ca + Mg
EN ISO 9963-1
ISO 7888
ISO 8288
ISO 6332
ISO 5814
ISO 10523
ISO 6878–1
ISO 9964–2
Service
General information
Verify compliance with the values specified in table 1 (page 22) and table 2
(page 23) through analyses.
If the analyses are carried out in accordance with different standards or by indirect means, calibrate such methods. A
clean surface with water supply and
drainage facility should be made available for carrying out the analyses. The
required equipment should also be kept
in a cupboard at the workplace.
ISO 9964–1
ISO 8245
ISO 6059
There is currently no European or international standard; see for example
DIN 38405-21 standardised German procedure for water, waste water and sludge
examination; anions (group D); photometric determination of solute silicic acid (D
21).
As an alternative, the permanganate index can be checked in accordance with
ISO 8467, if these values are specified.
29
Water quality
Water quality for steam boiler systems (cont.)
5607 288 GB
Measure the acid conductivity in the form
of the hydrogen ion concentration continuously in the same manner as the conductivity in hydrogen form, after the sample has gone through a severely acidic
ion exchanger with a volume of 1.5 l.
The exchanger is inserted into a cylinder
with a diameter:height ratio of 1:3 or less,
whereby the exchanger medium takes
up at least three quarters of the cylinder
volume.
Regenerate the ion exchanger when it
has been exhausted by two thirds. This
can be recognised when using an
exchanger with colour indicator and
transparent cylinder.
30
Commissioning
Preamble
This manual contains general information regarding the installation, commissioning, operation, maintenance and
inspection. It must be supplemented and
specifically adapted in accordance with
country-specific regulations. In addition,
any instructions for the equipment and
auxiliary systems that are part of the
boiler system must be incorporated into
the manual supplied with the system.
Only technically trained and instructed
personnel may operate this system.
Installation
Requirements for structural systems are
always subject to the regulations applicable in country of installation. The following represent some fundamental
requirements:
Valves and fittings of the steam boiler
and the steam boiler system together
with any safety and pressure relief facilities fitted to them must be installed, so
that these can safely discharge or can be
safely activated, and that the relief process can be clearly recognised.
5607 288 GB
Steam boiler systems must be installed
so that all parts can be correctly operated, maintained, repaired and monitored. The health and safety at work of
employees must be safeguarded at all
times.
Steam boilers and ancillary equipment
that form part of the steam boiler system
must be installed with regard to the prevention of shock, vibrations and sound
emissions as well as the protection
against any other risks, so that the systems are compliant with all technical
safety aspects.
31
Service
Installation requirements
Commissioning
Installation (cont.)
Clearances for operation and maintenance
Areas that must be accessed for control
and maintenance of the steam boiler
system must offer a head clearance of at
least 2 m and a clear width of at least
1 m. Individual boiler fittings may restrict
the clear width to 0.8 m.
In all other areas, a passage width of
0.5 m will suffice.
In the case of cylindrical boiler bodies,
the passage width on one side can be
reduced to 0.3 m.
The clearance between the boiler top
and the ceiling above must be at least
0.75 m, when access to that area is
required for operation and maintenance.
All inspection apertures of the steam
boiler system must be freely accessible
or must be able to be made accessible
easily.
Access to boiler rooms
The boiler room must not include installations to which personnel require
access who are not charged with working on the steam boiler system or who
might prevent the boilerman from carrying out his work.
Unauthorised personnel must not be
given access to the steam boiler system.
Affix prohibition notices on all entries to
the boiler room so that they are clearly
legible at any time. The boiler user must
determine the authorised circle of personnel.
Rescue routes, emergency exits
32
Doors in the way of escape routes must
be able to be opened easily from the
inside and must open in the direction of
escape.
The boiler room must be able to be adequately ventilated. For this, openings
must be provided at suitable points. If the
combustion air is drawn from the boiler
room, ensure that the boiler room is
never subjected to more than 0.5 mbar
negative pressure.
5607 288 GB
Rapid unhindered access to and from
the steam boiler rooms must be ensured
at all times through the number, location,
type and condition of escape routes.
Escape routes must lead away from the
danger area by a short and direct route.
Exits must be identified.
Boiler rooms should have two exits
opposite each other, one of which should
be designed as an emergency exit.
Escape routes and their exit points must
have a clear width of at least 0.6 m and
a clear head height of at least 2 m; they
must always be kept free and unobstructed.
Commissioning
Installation (cont.)
Platforms and handrails
To be able to safely operate fittings/
valves that must be activated or tested
daily or every three days, provide steps,
lean-to ladders with platform and protruding handrails or platforms with steps,
fixed ladders or lean-to ladders. Observe
German Health & Safety at Work Act
(UVV) "Ladders and steps".
Walk-on platforms or boiler covers
higher than 1 m above floor level and
stairs with more than five steps require a
handrail.
Access and working platforms and similar must not restrict the ventilation in the
boiler room.
Flue gas routing
Flue gases from steam boiler systems
must be routed so that they represent no
risk to personnel and third parties.
Lighting
Adequate lighting is required for the
steam boiler system, in particular in the
area of valves/fittings, controls and
safety equipment as well as in access
and escape routes.
Emergency lighting must be provided for
the escape routes and their exits. The
lighting installation must be maintained
in good working order at all times.
Commissioning
Service
First commissioning
Generally, commissioning is carried out
by Viessmann Industrieservice, the system installer or a contractor authorised
by them.
5607 288 GB
Commissioning preparations
Prior to commissioning the boiler, the following steps are a minimum requirement
and are the installer's responsibility:
33
Commissioning
Commissioning (cont.)
■ Checking the pipework depending on
version (e.g. retainers, expansion
joints, drainage systems, emptying,
venting).
■ Checking the fittings/valves for correct
selection and installation (e.g. correct
pressure stage and materials, flow
direction, controls, correct flange connection).
■ Ensuring the safe operation of all
boiler house facilities (equipment,
working and access platforms, handrails, insulation, heating, ventilation).
■ Testing the lighting system.
■ Checking the availability of fire fighting
and "First Aid" equipment.
■ Opening the front cleaning apertures
of the boiler and checking the turbulators (if part of the standard delivery)
and removing shipping brackets.
■ Operational telephone system.
Starting the boiler
The commissioning steps are subject
to the respective boiler equipment
and the type of ancillary systems. The
specific sequences must be determined individually for each specific
case.
The following details a sample
sequence for a system requiring no
supervision for 72 hours according to
TRD 604/Sheet 1 [Germany].
5607 288 GB
Stages of the work
■ Commissioning the chemical water
treatment system in accordance with
the manufacturer's operating instructions; adjustment of the safety equipment for monitoring the required water
quality
■ Filling the feedwater tank with treated
water and flushing the feedwater lines
■ Commissioning the dosing equipment
for feedwater conditioning
■ Commissioning the control panel
See page 35
■ Commissioning the feed pumps
(See also the commissioning instructions of the pump manufacturer with
reference to the required operating
conditions)
See page 35
■ Filling the boiler with feedwater until
the water level is visible in the sight
glass
See page 35
■ Adjusting the water level control
See page 35
■ Checking the water level limiting
equipment
See page 36
■ Burner commissioning
See page 36
■ Function check of the safety pressure
limiter
See page 36
■ Safety valve function check
See page 37
■ TDS controller adjustment
See page 37
34
Commissioning
■ Boilout
See page 37
■ Plugs/closures on the water side
See page 37
■ When installing an economiser, are
the air vent valve and drain closed?
■ Are the water level glasses open?
Flush on the DHW side if required.
Commissioning the control panel
Adjusting the water level control
■
■
■
■
■
■ 1. Staged control
– Checking the switching points for
pump ON and pump OFF via the
water level indicator
■ 2. Constant control
– After the water level has reached the
low water indicator, adjust the zero
point
– Fill the boiler up to the top edge of
the sight glass and adjust the 100 %
point at the controller
– Set the feedwater valve to CLOSED
via the controller and adjust the zero
point of the valve at the controller
– Set the feedwater valve to OPEN via
the controller and adjust the 100 %
point of the valve at the controller
– Set the limit switch at the straightthrough feedwater valve for pump
OFF
– Preset the switching points for pump
ON and pump OFF at the controller,
whilst the boiler starts with the steam
valve closed
– Set feed pump switch to automatic
at the control panel and check the
function of the water level control
■ Repeat this process after burner commissioning and when the boiler has
been pressurised. As the boiler water
heats up and consequently expands,
check the low and high water indicator
levels again.
Visual inspection
Switch ON the mains isolator
Setting the individual control MCBs
Checking individual functions
Checking the display/indicator functions
■ Checking the rotational direction of
motors and actuators
■ Function test "EMERGENCY STOP".
Commissioning the feed pumps
■ Filling the pumps with medium
■ Starting the pumps and checking the
rotational direction
■ Adjusting the operating pressure of the
pumps during the first filling of the
boiler
■ Supply pressure must be lower than
the max. operating pressure
■ Checking whether the boil-dry protection device is active and operates.
5607 288 GB
Filling the boiler with feedwater
Check the following:
■ Is the drain (blow-down valve) closed?
■ Is the TDS valve in its "CLOSED" position?
■ Is the air vent valve open?
■ Is the steam valve closed?
■ Are all inspection ports in the water
area watertight? Replace gaskets if
required.
35
Service
Commissioning (cont.)
Commissioning
Commissioning (cont.)
■ Let the water level return to the zero
point by opening the blow-down valve
and readjust at the controller
■ Bring the boiler to the required water
level and adjust at the controller
Checking the water level limiting
equipment
■ When the low water indicator level
(LWL) has been reached, reset the
water level limiter in the control panel
by resetting the boiler safety chain.
■ Check the response of the water level
limiter under operating conditions in
accordance with the manufacturer's
operating instructions. For this, take
the feed system out of use and reduce
the water level in the boiler to the low
water level by drawing steam or by
means of a blow-down. Observe that
both limiters must respond.
No unauthorised personnel should be in
the boiler house when the burner is
being commissioned.
Once the combustion is steady, raise the
operating pressure under partial burner
load or to burner stage 1 to an operating
pressure of approx. 3 bar. After that
value has been reached, the burner load
is enabled up to rated output. Now slowly
open the steam valve and close the air
vent valve.
Clean the steam lines in accordance with
the specification provided by the user
(blow-through). Ensure the adequate
drainage of the steam systems.
Subject to a steady steam draw-off the
combustion can be finely adjusted.
Agree the operating pressure subject to
the safety pressure with the system
user.
Function check of the safety pressure
limiter
Commissioning the burner
36
Adjust the safety pressure limiter so that,
before the safety valve responds, it
switches the boiler to fault status. The
setting pressure depends on the individual system and must be adjusted with
reference to the safety and operating
pressures. It must lie below the response
pressure of the safety valve.
Make the function check with a closed
steam valve and by bypassing the pressure controller (key switch or test button
on the control panel). The burner may be
operated with partial load.
5607 288 GB
Commission the burner in accordance
with the operating instructions issued by
the burner manufacturer. A prerequisite
for commissioning is that the fuel supply
is enabled and that, when operating with
oil, the quick-acting oil shut-off valve at
the tank operates correctly.
In the case of gas combustion, a healthy
gas supply from the local gas supply utility must be enabled and the gas line
inside the boiler house must be tested
and certified in writing by the system
installer as suitable prior to commissioning. The quick-acting gas shut-off valve
at the entry into the building must function correctly. Any required gas warning
equipment must function correctly.
Commissioning
Commissioning (cont.)
Safety valve function check
This function check serves to check the
set pressure and to verify that the safety
valve is capable of blowing off the
amount of steam occurring at full load.
Prior to implementing the function check,
verify that the discharge pipe has been
correctly routed and secured, that the
dewatering line has been connected to
the safety valve and that its outlet is
unobstructed and that no personnel are
anywhere near this area.
To check the safety valve, take the following steps:
■ Close the steam valve
■ Bypass the pressure regulator (key
switch or test button at the control
panel)
■ Bypass the safety pressure limiter in
the control panel
■ Set the burner to full load
The safety valve must open when the set
pressure has been reached; this must be
equal to or lower than the maximum permissible operating pressure of the boiler.
The boiler pressure can rise up to 10 %
above the permissible operating pressure before the safety valve opens. If the
pressure inside the boiler remains below
this value, then the valve functions correctly and the boiler can be shut down.
The function check must only be carried
out with a trained supervisor. For this
ensure that the boiler can be shut down
immediately and at any time via the
"EMERGENCY STOP".
TDS controller adjustment
This adjustment must also be made in
accordance with the manufacturer's
instructions. The maximum permissible
boiler water conductivity is specified in
the water standards (e.g. EN 12953, part
10 or page 23); these may differ. The
max. value must not exceed
6000 µS/cm to 20 bar. Agree the control
value with the user. Test the limit value
switch function regarding the max. conductivity by reducing the set value.
Boilout
For technical or safety reasons, a boilout
prior to commissioning the boiler is not
required for shell boilers.
5607 288 GB
Plugs/closures on the water side
During commissioning, check all plugs/
closures and flanges on the water side
for tightness and retighten in accordance
with page 46 point 17.
37
Service
Once the safety pressure limiter has
responded and a fault shutdown of the
boiler has been carried out, the safety
pressure limiter should be reset after a
pressure drop in the boiler and the boiler
should be started again in standard
mode.
After a successful function check, the
safety pressure limiter must be sealed to
protect it against unauthorised adjustment.
Commissioning
Commissioning (cont.)
Verification
Create a first commissioning report
where the established and set values are
recorded. This report must be signed by
the customer.
Instructions
Instruct the operating personnel after the
first commissioning. Create a report
regarding these instructions.
Returning the boiler into use after idle periods
Generally, it would be the local operators
who would return the boiler into use after
an idle period. Starting the boiler from
the external control room is not permissible.
The boiler must be returned into use in
the following sequence:
■ Walk around the system to visually
check its correct condition
■ Control panel commissioning – Circuit
breaker ON
■ Commissioning the feed
■ Checking the water level and the function of the water level indicator as well
as that of the water level control
■ Commissioning the combustion with a
closed steam valve
■ Controlling the output to partial load or
stage 1
■ Check the water level and, upon
reaching high water, reduce the water
level by means of a blow-down.
■ When the boiler pressure has risen to
3 bar below the permissible operating
pressure, slowly open the steam
valve.
■ Further checks as described in chapter "Utilisation and operation".
■ For one hour after starting the boiler
the system should be supervised by an
operator (only applicable to systems
without temporary supervision).
Shutdown
5607 288 GB
Shutdown means shutting down the system via the circuit breaker at the control
panel.
38
Commissioning
Commissioning (cont.)
The length of the shutdown period also
determines the preservation measures
described in chapter "Preservation". A
short-term shutdown is not recommended, as every start-up process subjects
the boiler to additional stresses. For a
period of up to 24 hours or over a weekend, the boiler should continue in operation. If pressure can be reduced via an
additional pressure regulator or via the
PLC, then the boiler can be operated
with reduced pressure (approx. 2 bar).
Only close the steam valve downstream
of the thermal water treatment (TWA)
outlet.
Note
For this ensure that the thermal water
treatment plant is not closed off by
damper valves, i.e. that it is not isolated
from the system pressure. Keep the thermal water treatment plant – and the
boiler – under pressure during short
shutdown periods.
Steps to take the boiler out of use
5607 288 GB
Service
■ Shut down combustion and close the
fuel valve
■ Feed the boiler up to the controlled
water level
■ Close the steam (see information
regarding the thermal water treatment
plant above) and feed valves
■ Switch off the circuit breaker
39
Utilisation and operation
Monitoring
Utilisation and operation
The supervision intervals are subject to
the user specification and the national
regulations applicable in the country of
installation. The operating, maintenance
and checking tasks as listed from
page 59 are suggested by the operator. These tasks are suggested as minimum requirements.
Checks are differentiated according to:
Per shift/day/week/month:
Carried out by the operator(s).
The period "Day" for systems with operation for
72 hours without supervision means every three
days.
Every 6 months/12 months:
These checks should be carried out by a specialist contractor, e.g. the Viessmann Industrieservice or the manufacturers of the boiler system, combustion equipment or water treatment.
All checks and their results must be
recorded with traceability.
Boiler log
■ Result of the regular water checks carried out as part of standard operation
■ All fault cases and special findings during inspections and maintenance of
the steam boiler system
5607 288 GB
This boiler log should be presented to
the authorised supervisory body during
every inspection. Make the following
entries in the boiler log:
■ Signed confirmation by the boilerman
of the inspection tasks carried out
■ Confirmation by a trained person
regarding the inspection and maintenance work carried out at the control
and limiting equipment every six
months
40
Utilisation and operation
What to do in case of operating faults
Note
See technical safety information on
page 4.
Generally, the operating instructions
should be observed regarding action in
case of operating faults. The following
highlights some aspects that are the
result of general operating experience.
5607 288 GB
If steam lines, fittings/valves and other
operating equipment on the steam boiler
system leak, and these leaks cannot be
remedied immediately, limit their effect,
identify and monitor them.
Areas at risk should only be entered if
this is requested by the authorised person and the safety measures required for
work inside the areas at risk have been
implemented.
System parts that have been shut down
as a result of a fault must only be started
following the instructions of the person
with the appropriate responsibility, once
the cause for the shutdown has been
removed and the system components
have been tested locally prior to the new
start.
■ Irregularities in the combustion operation or a deflagration have/has occurred
■ Medium is leaking from the pressure
part of the boiler
If dangerous conditions for boilers exist,
shut off such conditions from boilers connected in parallel.
If emergency operation should be enabled for operational reasons, agree the
required measures with the approved
inspection body and the manufacturer.
Service
Immediately shut down the steam boiler
system and inform the supervisor as
quickly as possible if a boiler condition is
suspected that could cause a dangerous
condition. This applies particularly if, for
example
■ A boiler wall shows signs of glowing
red hot or of a deformation anywhere
■ The safety valve cannot be made to
respond correctly
■ A correct operation of the controllers,
the limiters or flame monitors cannot
be ensured
■ A fuel leak is recognised
41
Repairs and inspection
Repairs
General requirements
Repair work may only commence after
the person responsible for such repairs
has determined the required safety
measures, has inspected their implementation and has declared the place of
work to be safe to proceed. Following the
completion of the work, safety measures
may only be removed on the instruction
of the person whose responsibility they
are.
Keep all gaskets in the closure systems
clean and dry. Additives, such as sealing
compounds or separating agents must
generally not be used. Exceptions
require the agreement of the gasket
manufacturer. Only use gaskets in their
original condition and in accordance with
the manufacturer's installation and operating instructions.
Work in areas at risk may only commence if the system or parts of the system have previously been reliably depressurised and are also not under negative pressure, that this state has been
secured and a person authorised by the
user has checked the implementation of
this measure and has certified in writing
that the area of work is safe. (This also
applies if line sections have been isolated for the purpose of a shutdown.)
These required measures that depend
on the individual system must be laid
down in writing by the user in the form of
operating instructions.
Working on hot pressurised medium
5607 288 GB
Work by personnel on systems or parts
of systems that carry hot pressurised
medium (e.g. valves in steam lines) is
not permitted if, during such work, the
risk of releasing the medium cannot be
totally excluded.
42
Repairs and inspection
Inspection
Inspections
The type and interval of inspections
depends on the regulations that apply in
the country of installation.
The following periods are suggested in
the declaration of conformity:
External inspection of the system: annually
Internal inspection
of the system:
every three years
Repeated pressure test:
every nine years
(max. test pressure
in accordance with
the initial pressure
test)
5607 288 GB
Prior to entering the steam boiler, pipe
connections (steam, feed and drain
facilities) to the operational boiler must
be securely and visibly separated by
means of adequately strong dummy
flanges or by removing pipe sections. If
on pipework with welded-in or seal-welded fittings the break is made by in-line
shut-off facilities, the intermediate connecting device that connects to the outdoor air must be opened. These shut-off
devices must be locked and secured
against unauthorised activation. Removing the hand wheels from these shut-off
devices is not enough. Warning signs:
"Danger! Persons inside the steam
boiler" must be affixed to the shut-off
devices in a clearly visible location, so
that the signs cannot be easily removed.
Removing the warning signs is only permitted with the agreement of the works
manager. Steam boiler and flues must
be well ventilated.
The entry into the steam boiler must be
explicitly requested by the person with
the appropriate authority. The entry must
be supervised. Prior to the safety measures being removed, a person with
appropriate authority must ensure that
no one is left inside the above parts of
the system.
During the entry into the steam boiler
and flues, electrical equipment may only
be used if, including its cables and leads,
it complies with the relevant safety regulations and has been provided by the
user or their agents for work inside the
steam boiler. Lamps must only be operated at safety voltages of up to 42 V. The
same regulation applies to electrical
tools. These may, however, be operated
with higher voltages of up to 380 V, subject to their supply being routed through
an isolating transformer. LV and isolating
transformers must be located outside the
steam boiler.
43
Service
Entering the steam boiler
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
10. Cleaning the sight glass in the cleaning aperture....... 50
•
•
12. Inserting turbulators (if appropriate) and closing the
boiler doors..................................................................... 53
•
•
•
•
13. Securing the cleaning cover.......................................... 54
•
•
•
•
•
16. Checking the inspection ports for leaks...................... 55
•
•
•
•
•
•
•
•
•
1. Commissioning the system........................................... 45
2. Shutting down the system............................................. 46
3. Removing the burner (if required)................................. 47
4. Opening the boiler doors............................................... 47
5. Opening the cleaning cover........................................... 48
6. Removing and cleaning turbulators (if installed)........ 48
7. Cleaning heating surface and flue gas collector......... 49
8. Cleaning the economiser heating surfaces................. 49
9. Checking all gaskets/seals and packing cords on the
flue gas side
11. Checking thermal insulation components and
gaskets............................................................................ 51
14. Mounting the burner....................................................... 54
15. Checking all connections on the water and steam side
for leaks
17. Checking the water quality............................................ 55
18. Checking the installation room ventilation
19. Checking the flue pipe for tightness
20. Adjusting the burner...................................................... 55
5607 288 GB
•
•
•
•
•
Page
44
Commissioning, inspection, maintenance
Further details regarding the individual steps
Commissioning the system
01. Check that the turbulators (if installed) are fully pushed into the hot gas
flues (open the boiler doors).
02. Check that the boiler doors and
cleaning apertures at the back of the
boiler are closed.
03. Check that the installation room
ventilation is unobstructed.
04. Check the function of the water
treatment system.
05. Fill the steam boiler with treated
water higher than the low water indicator level.
Note
In accordance with the TRD 611,
only suitable water must be used
with the steam boiler.
For water quality guidelines,
see from page 22.
06. Check all fitted components, such
as pipework, valves, controllers,
pumps etc. for function and tightness.
09. Open the shut-off valves in the oil or
gas line.
10. Switch ON the mains isolator, the
switch for the equipment required
for the boiler system and the burner
control switch in this order (observe
the burner manufacturer’s operating
instructions).
11. Start the boiler at a low heating output and gradually heat up to a pressure of approx. 3 bar below operating pressure.
Version with integral economiser:
To prevent steam hammer during
heat-up, initiate a feedwater flow
through the economiser several
times, for example by manually activating the blow-down valve.
12. Vent the boiler at the air vent valve
during heat-up until steam is expelled. Then close the valve.
Danger
Expelled medium can lead to
scalding.
Ensure the medium is
drained off safely.
13. Slowly open the steam valve after
the required steam pressure has
been reached, otherwise there is a
risk of steam hammer.
5607 288 GB
07. Check the fuel pressure.
08. Open the flue gas damper (if installed).
14. While the system heats up, check
the correct function of all control and
safety equipment.
45
Service
Details provided by the burner
manufacturer and regarding
accessories
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
15. Observe the pressure and temperature test equipment.
16. If required, drain and vent the connection lines.
18. Check the boiler doors and cleaning
covers for leaks after approx. 50
hours and retighten all screws (torque approx. 5 to 10 Nm).
17. Check the plugs/closures for leaks
and retighten if required.
Retighten all plugs/closures again
at max. permissible operating pressure. Torque values under cold and
hot conditions:
Cover
Handhole
Headhole
Manhole
Dimensions
100 x 150,
M16
220 x 320,
M20
320 x 420,
M24
Torque
100 Nm
200 Nm
350 Nm
Shutting down the system
Danger
Opening the boiler connections
and openings whilst the boiler is
under pressure can lead to a high
risk of severe personal injury.
Only open the connections on the
water and steam side and inspection apertures after the boiler has
been completely depressurised.
2. Close the shut-off valves in the oil
lines (at the tank and filter) or the gas
shut-off valve.
3. Isolate the system from the power
supply.
4. Close all valves.
5607 288 GB
1. Shut down the burner.
46
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Removing the burner (if required)
1. Remove the fuel supply line.
2. Undo screws B and remove burner
with burner plate A.
!
B
Please note
Ensure the burner and burner
plate are not twisted on
removal.
Use a suitable tool/lifting
apparatus.
A
Opening the boiler doors
Service
Undo screws B and open boiler door
A.
B
5607 288 GB
A
47
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Opening the cleaning cover
E
F
1. Flue gas collector
■ Remove nuts A and cleaning
cover B.
2. Flame tube entry
■ Remove screws C and pivot open
cleaning door D.
3. Economiser
■ Remove nuts E and cover F.
D
C
BA
Removing and cleaning turbulators (if installed)
Extract turbulators A without using
force using turbulator extractor B and
clean them.
A
5607 288 GB
B
48
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Cleaning heating surface and flue gas collector
1. Clean flues A, flame tube B and
reversing chamber with pneumatic
cleaner and remove combustion residues.
2. Remove combustion residues from
the flue pipe and the flue outlet.
A
B
Cleaning the economiser heating surfaces
1. Remove combustion residues via
cleaning aperture A or drain cleaning water via drain connector B on
the flue gas collector.
5607 288 GB
2. Clean heat exchanger surfaces
through cleaning aperture C with
pressure lances or, in the case of
severe contamination with feedwater.
In the case of wet cleaning always
ensure that the exchanger surfaces
are at almost identical temperatures
to the feedwater to prevent thermal
stresses and thermal shocks.
B A
49
Service
C
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Cleaning the sight glass in the cleaning aperture
5607 288 GB
Sight glass with gaskets A should be
checked for tightness and cleaned.
50
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Checking thermal insulation components and gaskets
A
Service
A
A
A
5607 288 GB
A
51
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
A
A
A
Note
Only undamaged and properly fixed
materials protect against the egress of
gas and overheating, and consequently
against material damage and injury.
52
5607 288 GB
Check all gaskets/seals A and insulating parts for damage and a firm seat.
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Inserting turbulators (if appropriate) and closing the boiler doors
B
A
1. Push turbulators A using turbulator
extractor B as far as they will go.
Service
2. Close boiler door C, tighten screws
D evenly and diagonally (torque
approx. 20 Nm).
D
5607 288 GB
C
53
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Securing the cleaning cover
E
F
D
C
Fitting in reverse order, as described
on page 48.
BA
Mounting the burner
1. Secure burner plate A with screws
B to the burner flange.
2. Thermally insulate the space
between the flame head (burner) and
the burner opening (boiler).
3. For pressure-jet gas burners,
fit the gas supply pipe.
B
54
A
5607 288 GB
Danger
Escaping gas leads to a risk of
explosion.
Check all gas connections for
tightness.
Commissioning, inspection, maintenance
Further details regarding the individual steps (cont.)
Checking the inspection ports for leaks
Note
Replace the gaskets every time a connection has been opened.
Only use gaskets approved in accordance with TRD 401, appendix 1 or
VdTÜV [or local regulations].
Gasket manufacturer's installation instructions.
Checking the water quality
For water quality guidelines, see
from page 22.
Adjusting the burner
5607 288 GB
Service
By the burner manufacturer or authorised heating contractor.
55
Spare parts
Wearing parts, gaskets
5607 288 GB
Note
When ordering spare parts, please quote the serial number and the boiler type (see
type plate).
Quote required number of spare parts.
Obtain standard parts from your local trade supplier.
56
Spare parts
5607 288 GB
Service
Wearing parts, gaskets (cont.)
57
Spare parts
5607 288 GB
Wearing parts, gaskets (cont.)
58
5607 288 GB
Water level - display equipment
Remote water levels
Sampling facility
Water level controller
Water level limiter
Flow limiter
Thermostat or pressure switches
Temperature or pressure limiter
Temperature or pressure indicators (pressure gauge)
Drain and TDS facilities
Boiler - fittings
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.9/12
3.2.10/13
3.2.8/11
3.2.14
3.2.15
Service
Safety valves
See
Section
TRD 601
Sheet 2
3.2.1
Tasks comprising operation, maintenance
and inspections/tests per:
Day
S
F
S
S
S
S
F
S
F
S
Month
Week
72 hours
Shift
Checklist for a steam boiler system (steam and hot water boiler)
( S = Visual inspection; F = Function test; F* - at six monthly inspection (to TRD))
Operation of steam boiler systems
Part 1- General instructions for users
of steam boiler systems
For steam boilers category IV
Issue June 1983 (unchanged 8/93)
6 months
F*
F*
F*
F*
F*
F*
F*
By activation
By activation
Change in set value /
test keys
Checking with precision thermometer /
Zero point test
Carry out comparative test
Blow through or reduction
to switching point
Flow reducer
Blow through and operation
Blow through and for boilers
with p < 32 bar
Comparison of display with the directly
indicated water level
Operation and clear passage
Vent
Type of tests (examples)
TRD 601
Operation
Appendix 1
Appendix
Operating, maintenance and inspection tasks
59
12 months
60
Emergency stop switch
Ignition
Ventilation
Flame monitor
Assessment of combustion
Assessment of combustion chambers
and flues
Emergency stop switch
3.4.11
3.4.12
3.4.13
3.4.14
3.4.15
5607 288 GB
3.4.17
3.4.16
Burner limit switch
Safety shut-off facility
upstream of the burner (for a 72-hour-operation
also in the return line)
Tightness checking facility
or intermediate air vent valve
Fuel store and
lines/valves/fittings
Fuel indicator
3.4.10
3.4.9
3.4.8
3.4.7
3.4.6
3.4.5
3.4.4
3.4.3
3.4.2
Burner control
(servomotors for air and fuel)
Combustion air fan,
ignition and/or cooling air fan
Air pressure-volume display
and air pressure switch
Fuel shut-off facility
Flue gas dampers - limit switch
3.4.1
3.3.3
3.3.2
Feedwater and circulation facilities
Feedwater and
boiler water testing
Devices for monitoring boiler water
regarding ingress of foreign matter
3.3.1
F
S
S
S
F
F
F
S
S
F
F
F
F
F
S
S
S
S
S
S
X
S
F*
F*
F*
F*
F*
F*
F*
Through covering the sensor
Pivoting the burner,
pulling the burner lance
Activation
Operation, leaks
Operation, leaks
Operation
Quiet running, transfer of power
(e.g. Vee-belts)
Interruption of the pulse line
Operation
Closing and re-opening of the
damper
Activation of test key
Through analytical monitoring
acc. to TRD 611
The alternate operation
Appendix
Operating, maintenance and inspection tasks (cont.)
Keyword index
Keyword index
A
Access to boiler rooms.......................32
Adjusting the water level control........35
Air vent shut-off valve........................14
B
Blow-down.........................................14
Boiler log............................................40
Boilout................................................37
C
Checking the water level limiting equipment...................................................36
Clearances for operation and maintenance.................................................32
Commissioning preparations.............33
Commissioning the burner.................36
Commissioning the control panel.......35
Commissioning the feed pumps.........35
Conditioning.......................................26
D
Dry preservation.................................20
E
Entering the steam boiler...................43
Escape routes, emergency exits........32
F
Filling the boiler with feedwater..........35
Flue gas routing.................................33
Function check of the safety pressure
limiter.................................................36
L
Level monitoring.................................11
Lighting..............................................33
P
Platforms and handrails.....................33
Plugs/closures on the water side.......37
Preserving the hot gas side...............20
Pressure monitoring facility................16
R
Returning the boiler into use after idle
periods...............................................38
S
Safety valve.......................................13
Safety valve function check...............37
Sampling cooler.................................17
Shutdown...........................................38
Starting the boiler...............................34
Steam shut-off valve..........................14
T
T.D.S. unit..........................................15
TDS controller adjustment.................37
U
Utilisation and operation....................40
W
Water level indicator..........................15
Wet preservation................................18
What to do in case of operating faults41
5607 288 GB
I
Inspections.........................................43
Installation drawing..............................9
Installation requirements....................31
Instructions.........................................38
61
62
5607 288 GB
63
5607 288 GB
Subject to technical modifications.
chlorine-free bleached paper
Printed on environmentally friendly,
64
Viessmann Limited
Hortonwood 30, Telford
Shropshire, TF1 7YP, GB
Telephone: +44 1952 675000
Fax: +44 1952 675040
E-mail: info-uk@viessmann.com
5607 288 GB
Viessmann Werke GmbH&Co KG
D-35107 Allendorf
Telephone: +49 6452 70-0
Fax: +49 6452 70-2780
www.viessmann.com