Download WISE User Guide - Transportation Research Board

Transcript
Figure 37: Displaying Analysis Results
The first part of the WISE output summarizes basic inputs of the analyzed scenario. It displays the
overall planning horizon, month-specific seasonal factors, and number of projects specified by inputs.
The second part of the WISE output displays the recommended sequence of each project, as well as
its associated traffic variables, in an order of construction modes following daytime construction,
nighttime construction, and both.
Figure 38: Displaying Project Sequence and Its Associated Traffic Variables
Figure 38 shows an example of displaying the project sequence result in the output. It sets forth a
quick summary of Project setup, including Project ID, link where the Project resides, capacity reduction
rate, original posted speed limit, new posted speed limit during construction, and agency cost involved
for implementation.
37