Download ShoreTel Planning and Installation Guide
Transcript
C H A P T E R 1 4 Site Requirements and Preparation This chapter provides information about preparing your site for the ShoreTel system, including concerns such as physical space, environment, and cabling. 14.1 Checklist Review the following site requirement topics before proceeding to the next chapter: Task Description Recommendations page 191 Voice Switch Requirements page 192 Racks and Cabling page 197 A 19-inch data rack, shelf, and modular patch panels can be purchased from most major electrical suppliers. page 198 Table 14-1 Site Requirements and Preparation Checklist 14.2 Recommendations The following recommendations will assist you in planning and preparing your site for the ShoreTel system. Hire a cabling contractor to install your racks, patch panels, and cabling. Have an RJ-48C cable ready for each voice switch. 14.2.1 Switch Models You can locate the model number of your switches on the rear panel as shown in Figure . This document distinguishes between switches based on the model number and the number of RU’s the switch occupies. ShoreGear 120 Model Number Label ShoreTel 11.1 191