Download part 1
Transcript
REHABILITATE CAUDELL HALL BUILDING 18 STATE UNIVERSITY OF NEW YORK BUFFALO STATE COLLEGE SUCF PROJECT NO. 03421 DIVISION 23 – HVAC points list provided with each sequence of operation.. Each log shall cover three 48-hour periods and shall have a sample frequency not less than 10 minutes or as specified on its points list. Logs shall be accessible through system's operator interface and shall be retrievable for use in other software programs. 7. B. 3.21 Tests that fail to demonstrate proper system operation shall be repeated, at the contractor’s expense, after Contractor makes necessary repairs or revisions to hardware or software to successfully complete each test. Acceptance: 1. After tests described in this specification are performed to the satisfaction of both Engineer and Owner, Engineer will accept control system as meeting completion requirements. Engineer may exempt tests from completion requirements that cannot be performed due to circumstances beyond Contractor's control, such as seasonal requirements or construction progress issues. Engineer will provide written statement of each exempted test. Exempted tests shall be performed as part of warranty. 2. System shall not be accepted until completed demonstration forms and checklists are submitted and approved. CLEANING A. Each day clean up debris resulting from work. Remove packaging material as soon as its contents have been removed. Collect waste and place in designated location. B. On completion of work in each area, clean work debris and equipment. Keep areas free from dust, dirt, and debris. C. On completion of work, check equipment furnished under this section for paint damage. Repair damaged factory-finished paint to match adjacent areas. Replace deformed cabinets and enclosures with new material and repaint to match adjacent area. TEMPERATURE CONTROLS 230923 - 33