Download 2008 Design Standards Supplement - Miami

Transcript
20.
For new schools and major additions an In-Contract (IC) Marquee sign
shall be provided at the appropriate location. Underground electric and
data conduit shall be installed for the IC school Marquee Sign. The data
line for the sign shall terminate at a Telecommunication Closet so that it
can be programmed from a secretary station in the Administration Office.
21.
Provide a compact facility footprint and design to accommodate future
expansion by building addition or by portable classrooms, according to
program requirements and Division 13.
A. A specific area or areas next to the building shall be designated on
the site plan for future buildings or portable classrooms. Keep this
area clear of underground utilities, easements, circulation paths,
and other encroachments.
B. Areas identified for future expansion shall incorporate a design
solution with accessibility, security, utility servicing, and
control/monitoring of these areas available from the permanent
facility.
C. Provide utility stub outs for future expansion according to program
requirements and Division 13, 15 and 16.
22.
Classroom acoustics shall meet ANSI Standard S12.60-2002.
23.
A maximum Reverberation Time (RT) of 2.0 seconds is now required for
Gymnasiums. Reverberation time is measured in seconds (500/1000 Hz)
per national average requirement in mid-range frequencies. A qualified
acoustics professional, accepted by M-DCPS, shall design the acoustic
treatment for the Gymnasiums according to all acoustical requirements.
24.
Provide a 4’ x 8’ or 8’ x 8’ construction sign at all new schools and
additions prior to the start of construction. Obtain the size requirements,
sample layout and additional requirements from the M-DCPS Project
Manager.
25.
Low speed gunpowder-activated fasteners may be used for limited-uses
on M-DCPS Construction Projects. They shall not be used as the main
support for construction elements located over-head. They may be used to
fastened electrical conduits up-to 1-1/4” in diameter and miscellaneous
electrical fixtures and electrical panels. For any other usage, approval
must be obtained from M-DCPS Facilities Design and Standards on a per
project basis. In Remodeling Projects gun-powder-activated fasteners
shall not be used when the public, staff and students are in the immediate
area of construction.
Design Standards 2008 Supplement
January 2008
Page 5 of 39