satisfactory way.
A further problem which arose from this was, that when a member was looking to work on a part of the
project which would afford them good experience, their previous contributions on another system was
required to be either repaired or extended. This presented difficult managerial decisions about whether
to give the member the experience, or to complete the the related task in less time.
The solution was to compare the current progress of the project in terms of the next deadline, with the
tasks previously performed by each member. If a member felt that they needed more practise in an area
which they had little experience of, they would only be changed if time allowed. Conversely, when there
were no deadlines, or a deadline had recently passed, then each members role was reviewed and they
were asked whether they would prefer to change to another task. All decisions were monitored by the
project supervisor, and were corrected if required.
6.4 External Factors
During the entire course of the project, there were matters external to the team and the university, which
had to be resolved or completed to ensure smooth running, or at the very least continuation, of the
project. Mostly, they were issues of component supply and lab access. They are detailed below as a
problem and resolution:
6.4.1 Project Bench
In order to produce the circuit, a project bench in the level 7 electronic lab of the Rankine building was
required. A bench had to be requested from staff at the ECS stores. Since two different projects, level
3 TDP (Team Design Project) and level 4 final year projects, both run in level 7, benches are in short
supply. After an allocation error, we were moved from the project lab out into the main teaching area.
After the bench was allocated properly, equipment had to be requested from the stores. This included an
oscilloscope, ac/dc power supply, signal generator and a runabout locker with combination lock. Once
the equipment was in place the combination for the lock was made available to the rest of the team.
It was intended that the bench could be used by all ESE project teams, however only one other team
required such facilities and this was only for a brief time.
6.4.2 Lab Access
Due to the workload of level three ESE, the team had little free time during the day to work on the
project. To solve this, all level 3 computing science students are able to obtain a PAC key fob, which
enables them to enter the Boyd Orr building, and even the Lillybank offices, out of hours. With this key,
students are able to gain access on a room by room basis. The majority of level three students, including
all ESE students, acquired a fob key. All but one of the team members were able to work during the day
on the weekends in the lab, so an extension of access to the Lego lab on level four was requested and
applied for all ESE students’ fobs.
Labs in the Rankine building, however, can only be accessed during the normal opening hours of 9-5.
Computing facilities on level 3 were required for the use of ORCAD and labs on level 7 for the project
bench. This problem could not be worked around, and so work was scheduled with these access times
in mind. Also, whereas the Boyd Orr building can be accessed during holiday periods, the Rankine
building could not. This meant that work on the circuitry had to be complete before the Easter break.