Chapter 5
Getting Connected
System Power Up
System Power Up
By now your lab should be equipped with the proper power supply and outlets as
described in Power Requirements in Chapter 1, Laboratory Preparation. You also
should have completed the gas supply plumbing procedure, as described in
Chapter 4, Plumbing the Gas Supply to the GC.
If you have not already done so, connect the power cord to the GC. Plug the power
cord into the appropriate power outlet. The power switch is located on the back
side of the GC. Flip the switch to the ON position.
If the detectors are not already installed on your TRACE GC Ultra, you will need
to install them now. Refer to the TRACE GC Ultra Operating Manual for more
information about installing detectors.
You will need to install a column in the GC. Refer to the TRACE GC Ultra
Operating Manual for more information about installing columns.
For system test information, refer to the TRACE GC Ultra Standard Operating
Procedures Manual, and to the user manuals of any accessories you have
connected to your TRACE GC Ultra system.