STONEX R2 ③ Enter into the screen of Slope 【Slope Stake Out】 Stake Out function, input prism height, PtID: R.HT: △LOff : △TOff : collimate the point that is to be intercepted near the slope, and press [F2] C100+10.0S 2.000 m ---.--- m ---.--- m Ⅰ [F2] (DIST) to start slope stake-out. The system will select an appropriate All DIST RECORD EDM slope from the data input in last Step. Suppose to set the height of measurement point as the horizontal datum plane, calculate the intercepted point. The list displays the offset between measurement point and calculated point. The method to stake out slope is similar to that of point stake-out. When both △ L-Off △ T_Off are zero, it indicates that the stake-out point is found. 【Slope Stake Out】 Left(1:n) Cut: 1.350 Fill: 1.000 Right(1: n) Cut: 1.200 Fill : 1.650 LEFT RIGHT ④ After finishing staking out this point, press [ESC] to return to the main screen of Slope Stake Out, input other slope to be staked out to proceed the stake-out of next slope via the same approach. Note: 1) If the earth surface crosses the hinge point, the intersection cannot be calculated. 2) As the fill/dig value of calculated point is zero, therefore the fill/dig value is not displayed. 5.13 CONSTRUCTION SITE STAKE OUT This application allows defining a construction site by combining set-up of the instrument along a construction line, measuring and stake-out points related to the line. After activating the application, you have 2 options: a) New construction site b) Continue with previous site (skips set-up) 5.13.1 Defining New Construction Site OPERATIONAL STEPS: 144