Download SGAT User Guide - Watershed Management Division
Transcript
In this manner, the tracing then continues upstream from one stream segment to the next. At the end of each stream segment, a test is made to determine whether a sub-watershed boundary is coincident with that point. (Remember that Step 05 clipped the stream segments with the subwatershed boundaries.) If a sub-watershed boundary is found then a reach point is created at that point. If a point of confluence is encountered, then the stream segment chosen will be the one forming the “hardest right turn” from the perspective of the direction in which stream network is being traced. If it is found that no other segments are “connected” to an end vertex, a terminal reach point is inserted at that point. Stream tracing is then reversed and proceeds downstream. Using the above as an outline, the figure below illustrates the order of stream tracing. (Note: Neither sub-watershed boundaries nor reach points are shown in that figure.) Assume that tracing begins at the confluence point in the upper right corner; and the red arrows show the upstream direction and the green arrows show the downstream direction. Tracing occurs in the numerical order shown. Only those stream segments to which tributary identifiers have been assigned are shown. 6 4 1 7 3 8 5 9 10 14 2 11 Upstream Tracing Downstream Tracing 12 13 If one misses assigning a tributary identifier to a segment in the middle of the main stem or a tributary, stream tracing will stop at the ending vertex of the last segment for which the identifiers have been assigned to contiguous stream segments. This vertex will be identified as a terminal reach point; and any upstream segments beyond the one for which the tributary identifier was not assigned will be ignored. (See section description for Step 04.) April 2006 Step 06: Calculate Reach Points and Reach Point Data Page 121