Download 7100s.Cover iss2.0
Transcript
Commissioning Chapter 4 COMMISSIONING AND MAINTENANCE SAFETY DURING COMMISSIONING AND MAINTENANCE Please read carefully before commissioning the unit Important! • Eurotherm shall not be held responsible for any damage, injury, losses or expenses ! incurred by inappropriate use of the product or failure to comply with this manual. • Accordingly the user is responsible for checking, before commissioning the unit, that all the nominal characteristics correspond to the conditions under which it is to be installed and used. Danger! • The product must be commissioned and maintained by qualified personnel, authorised to work in an industrial low voltage environment. Users must not attempt to access internal parts. The heatsink temperature may exceed 100°C. The heatsink remains hot for approx. 15 minutes after the unit is shut down. Avoid touching the heatsink even briefly while the unit is operating. COMMISSIONING CHECKING THE CHARACTERISTICS ! Before powering up the unit, check that the identification code corresponds to the code specified on the order and that the characteristics are compatible with the facility. Load current The maximum load current must be less than or equal to the nominal current value of the solid state contactor, taking account of supply and load variations. Supply voltage The nominal voltage value must be greater than or equal to the line-to-line or line-to-neutral supply voltage (depending on the connection scheme). ! Never use the unit on a supply with a voltage greater than the nominal value +10% as this could damage the protection components or even the thryistors. Input signal The signal type is factory configured depending on the option ordered. Check that the signal used corresponds to the input type indicated on the front panel of the unit (LDC, HAC or ATP). Load type (DLF option) For correct operation of the partial load failure detection system, ensures that load type used corresponds to the product code (LTCL or SWIR). 4-2 7100S User Manual