Download MatGuard
Transcript
Section 6 - INSTALLATION AND COMMISSIONING This manual should be read in full before commencing installation. Study this section completely before starting work. The installation and commissioning should be supervised by the system designer. A mechanical technician and an electrician familiar with industrial wiring practices will be required to undertake the installation. Commissioning should be undertaken by a trained electrical technician experienced in safety installations. The following special tools are required: Crimp tool for pre-insulated butt splice connectors (e.g. Raychem AD-1522-T) Fig. 21 Fig. 22 Hot air gun with reflector attachment for heat shrinking (e.g. Raychem HL1802E) 6.1 MAT INSTALLATION Isolate and lock off the machine power supply at source. Check that the floor is flat, smooth, clean and free of debris and that any buried conduit or other wiring provision is correctly in place. Unpack the mats being careful to keep them flat and not to pull on the wires. Place the mats on the floor in the planned positions with the connecting wires at the periphery of the detection zone. Connect the mat sections together according to fig. 23. WHITE 1 WHITE 2 3 4 BLACK BLACK TERMINALS AT CONTROL UNIT WHITE BLACK WHITE BLACK WHITE BLACK WHITE BLACK SENSOR MATS Fig. 23 NOTE: The mat wires have a black outer covering. Two have a black inner sheath and two have a white inner sheath (see fig. 23 for positions). 26