Download - Worcester Bosch
Transcript
SERVICING AND SPARES 7. GAS VALVE ▶ ▶ ▶ ▶ ▶ ▶ ▶ ▶ Isolate gas supply at boiler gas cock. Pull out air inlet tube (A). Undo top gas connection (B) to gas valve. Undo bottom gas connection (C) to gas valve. Undo two securing screws (D)on the underside of casing. Pull valve up and forward out of boiler. Disconnect electrical connections. Replace valve with new seals and check for gas soundness. 3. The valve will require setting, follow procedure “Setting the gas/air ratio” in the gas conversion section. 7. B A C 6 720 812 174-25.1O Fig. 72 Gas valve removal 8. Siphon/condensate trap 1. Pull condensate pipe out of the adaptor. 2. Remove trap from boiler. ▶ Clean trap and check that the connection to the heat exchanger is clear. ▶ Fill the condensate trap with approximately 1/4 litre of water and refit in reverse order. 4. 2. 1. 5. 6 720 812 174-24.1O Fig. 73 Siphon removal 6 720 812 174-20.1O Fig. 71 Sensors 40 6 720 815 723 (2015/05)