Download Second Best practices manual
Transcript
IRELAND CASE STUDY: TALLAGHT LIBRARY SOUTH DUBLIN COUNTY CIVIC OFFICES DUBLIN 24 Best practice or behaviour: The energy audit carried out as part of the EPLACE Project identified preliminary opportunities for energy saving. The installation of the WeSave monitoring equipment will assist in further identifying energy saving opportunities through improved user behaviour. Best practice in staff energy management and awareness will be incorporated into training provided to the building manager and staff as part of the EPLACE project. SITE INFORMATION: General information Building characteristics Finglas Leisure Centre comprises a 25m swimming pool, a fully equipped gymnasium, a large aerobics studio, a Steam room and Sauna, a large changing village and 6 outdoor floodlit pitches. The leisure centre is open to the public seven days a week for a total of c 100 hours per week. The leisure centre was built in xxx. The building is a two storey lightweight steel framed structure with metal decking roof and side walls, with a total floor area of 2880 m2. The building was designed with energy efficiency in mind and includes high levels of insulation (with an average u-value of 0.46), heat recovery ventilation and a combined heat and power plant. In addition to standard glazing, daylighting has been maximised by the addition of roof lights in the pool hall, gym, reception and changing village. These roof lights 135