Download Evaporative Cooling Humidifier
Transcript
Evaporative Cooling Humidifier Installation Instructions and User Manual Stage 1 – On Site Assembly of Evaporation Module On site assembly of the SKV evaporation module is necessary when its height and width are incompatible with maximum shipping dimensions. CAUTION. Risk of injury. Some sheet metal parts might present sharp edges and some handling and assembly will require working with a ladder. We recommend wearing protective gloves and any appropriate other protective equipment during handling and assembly of the SKV evaporation module. ! We recommended installing the SKV evaporation module into a waterproof AHU or duct section. The SKV evaporation module is a self-contained humidifier/cooler however; leaks might occur at the water and drain connection point. ! WARNING: Risk of malfunction. SKV evaporation module must be level in the 2 plan directions. Bottom tank, main support beam and pump skid will usually be pre-assembled at the factory before delivery. However, the main support beam for the evaporative media panels as well as the pump skid can be easily removed and re-installed as indicated in steps 1 and 9. Tools required: Philips screw driver size #2 & #3 Wrench sizes 7/16’’ (11mm) and 5/16’’ (8mm) Level Step 4 Top frame 4C 3C 5C 6C Step 5 Media panels 2C 1C 2B 3B 4B 5B 1B 4A 1A 2A 5A 6B 6A Step 6 Panel link bracket (at least 1 per level) 3A Step 7 Holding rail (1 per level) Step 2 Side frame sections (factory assembled if H=W) Step 9 Pump skid assembly (factory assembled) Step 3 Side frames (x2) Step 1 Main support beam (factory assembled) Step 8 Water distribution drawers Step 11 Water distribution hoses (1 per drawer) Step 10 Drain manifold assembly (factory assembled) Illustration 5 - Evaporation Module Assembly www.neptronic.com Page | 7