Evaporative Cooling Humidifier
Installation Instructions and User Manual
Stage 1 – On Site Assembly of Evaporation Module
On site assembly of the SKV evaporation module is necessary when its height and width are incompatible with
maximum shipping dimensions.
CAUTION. Risk of injury. Some sheet metal parts might present sharp edges and some handling and
assembly will require working with a ladder. We recommend wearing protective gloves and any
appropriate other protective equipment during handling and assembly of the SKV evaporation module.
!
We recommended installing the SKV evaporation module into a waterproof AHU or duct section. The SKV
evaporation module is a self-contained humidifier/cooler however; leaks might occur at the water and drain
connection point.
!
WARNING: Risk of malfunction. SKV evaporation module must be level in the 2 plan
directions.
Bottom tank, main support beam and pump skid will usually be pre-assembled at the factory before delivery.
However, the main support beam for the evaporative media panels as well as the pump skid can be easily
removed and re-installed as indicated in steps 1 and 9. Tools required:



Philips screw driver size #2 & #3
Wrench sizes 7/16’’ (11mm) and 5/16’’ (8mm)
Level
Step 4
Top frame
4C
3C
5C
6C
Step 5
Media panels
2C
1C
2B
3B
4B
5B
1B
4A
1A
2A
5A
6B
6A
Step 6
Panel link bracket
(at least 1 per level)
3A
Step 7
Holding rail (1 per level)
Step 2
Side frame sections
(factory assembled if H=W)
Step 9
Pump skid assembly
(factory assembled)
Step 3
Side frames (x2)
Step 1
Main support beam
(factory assembled)
Step 8
Water distribution drawers
Step 11
Water distribution hoses
(1 per drawer)
Step 10
Drain manifold assembly
(factory assembled)
Illustration 5 - Evaporation Module Assembly
www.neptronic.com