Download Megagen DPR45
Transcript
RENTAL SERIES ELECTRICAL GENERATOR 4 STARTING AND STOPPING THE UNIT To start up the Electrical Generator, follow the steps listed below: 1) Check the levels of oil, coolant and fuel. 2) Close the battery isolator. 3) Release the emergency shutoff switch if it has been pressed. 4) Check the Electrical Generator’s automatic switch (levers should be in the lowered position). 5) To perform the startup of your Electrical Generator, please refer to point 6 - OPERATION MANUAL, taking into account the control panel model of your unit. 6) Once the unit has been started, connect the Electrical Generator’s automatic switch. 7) Make sure the earth leakage circuit breaker (ELCB) is functioning properly by pressing the TEST button. 8) Turn on the electromagnetic circuit breaker once again and use the Electrical Generator normally. To stop the unit: 1) Disconnect the loads. 2) Turn off the electromagnetic circuit breaker. 3) Leave the engine running at no load for 2 minutes to cool down the generator unit. 4) Stop the Engine completely by switching the control module switch to the OFF position. USERS MANUAL Page 18 of 62