Download Barfield DPS 450 Manual

Transcript
Testing and Fault Finding
5-2
5.2 Standard Serviceability Test
#
The following procedure shows if the unit is serviceable and checks functions and
facilities of the ADTS 505. In this procedure:
/
All key presses are highlighted in BOLD and shown as identified on the
front panel.
/
Key presses inside brackets e.g., [Units], are soft key presses (i.e., function
key selections {F1 to F6} indicated on the screen).
Procedure
#
#
#
#
#
#
#
#
#
Connection and power-on checks.
Connect power to the unit.
Make sure the blanking caps are fitted to the Ps
and Pt front panel outputs.
Set the power supply switch to ON.
Check power indicator is on.
Check the display shows the first power-up
message.
Check the display all the power-up messages.
The ADTS 505 displays any detected errors, refer
to fault finding.
Check that the display then changes to show
measured aeronautical or pressure values. This
depends on the display set-up.
Þ
Þ
Þ
1 The displayed values change as atmospheric pressure changes at power-up.
Þ
K260 Issue No. 3
Þ
2 The unit requires
15 minutes to
warm-up to
achieve full
accuracy and
stability.
Þ
NOTES