Download SBE 19plus V2 Manual - Sea
Transcript
Manual revision 011 Section 3: Power and Communications Test SBE 19plus V2 Test Setup 1. Remove the dummy plug from the Y-cable and install the I/O cable: A. Pulling the plug firmly away from the connector, remove the dummy plug from the 4-pin connector on the Y-cable strapped to the 19plus V2 housing. Note that the Y-cable is connected to the Data I/O, Pump, and External Power connector on the 19plus V2 end cap, and provides power to the pump via the 2-pin connector as well as communications with the computer via the 4-pin connector. B. Standard Connector - Install the I/O cable connector, aligning the raised bump on the side of the connector with the large pin (pin 1 - ground) on the Y-cable. OR MCBH Connector - Install the I/O cable connector, aligning the pins. 2. Connect the I/O cable connector to your computer’s serial port. Note: Y-cable from this connector connects to pump and data I/O - power cable. 27