Download NGC Instrument Guide - Bio-Rad
Transcript
Plumbing NGC Systems To plumb and prime the system pump wash lines 1. Mount a tube holder to the right or left side of the instrument in either the upper or lower rack slots. 2. Fill a 50 ml tube with 20% isopropanol (IPA) and insert it in the tube holder. Tip: You can use 20% ethanol as an alternative. 3. Connect inlet tubing to the pump wash inlet port (left rear port) on system pump A. 4. Immerse the other end of the pump A wash inlet tubing in the tube of 20% IPA. 5. Connect the pump head wash priming tubing to the outlet (right rear port) on system pump B. 6. Connect a 1/4-28 female to female luer adapter to the pump head wash priming tubing. 7. Connect a 1/4-28 union to a second inlet tubing. You will use the inlet tubing as the outlet tubing for system pump B. Tip: Set the inlet tubing with the attached union aside. Keep it close by, as you will attach it to the pump head wash priming tubing on step 12. Instrument Guide | 267