Chapter 4, Testing and evaluation
4 Testing and evaluation
The revised list of requirements in Appendix E presents not only features of the system but
also guidelines for the work. This chapter is mainly about the features and behaviour of the
system and how it was tested.
Typically each new control signal was verified first with a set of different manual
inputs, then on real data comparing outputs from the two systems and lastly with connection
to the real process. All these steps have taken some time and although the final tuning with
connection to the real system was more time consuming, the actual work involved has been as
much in the earlier tests. The examples of testing presented in this report are all from the
phase when there was a connection to the real process. This is because it is more interesting
when it can be shown how the process actually reacts and not only what the control system is
attempting to do.
Figure 4.1: Front Panel of control.
To be able to do all these tests the VI named control has a Front Panel with a lot of different
options (see Figure 4.1). When control is run as a standalone application on cRIO this Front
Panel is not drawn anywhere. However, control can present the Front Panel on the screen of
the host computer via Ethernet. This makes it possible to individually turn on and off all of
22