Download FinalPaper_Kate - Repository TU Delft
Transcript
1.2 Used Methodology The project will be executed in seven phases. In table 1 all phases are explained, together with the documents that were the result of that phase. Although this resembles a waterfall model, the phases are not strictly separated; a phase can start when the previous one is not finished yet. This will prohibit losing time in the first weeks of the project when a phase takes more time than planned. To monitor the progress, a formal meeting with the TU Delft assessor is planned weekly. A meeting with the TNO assessor is planned once every two weeks. For the BSc. coordinator, two-weekly progress reports and a timesheet are written. Table 1. Defined phases of this project Phase Goal Plan Plan the project to ensure that the results will be delivered on time Research Research the field to be able to create a state of the art solution RequireDefine the demands on the system to ments make sure that the right result is created Design Design the best possible solution ImpleCoding to realize the solution mentation Testing Test the implementation for quality insurance DocumenWrite documentation to enable future ting development and prove capability of project group to assessors Weeks 1 Documents Plan of Approach 1,5 Orientation Report 1,5 Requirements Document 1 4 Design Document Code and Javadoc 1 Test Plan and Test Results Document 1 User Manual, Developer Manual, Final Paper, Presentation, Trac data Plan: a proper planning will help to deliver the product at the right time. In the plan of approach, expectations of the involved people are defined and a weekly planning with targets is listed. It contains a list of products to be delivered. It also contains a list of dependencies the project has on resources made available by TNO and TU Delft, like server access and work environment. The plan will have to be approved by the assessors of TNO and TU Delft. The format of the plan is based on Prince2, a method for project management. This phase was supposed to be executed in a week, however the document was approved in the fifth week. Research: trying to create a state of the art application requires a lot of research, both in the field of Travel Time Prediction and in Mobile App making. On top of that, learning the finesses of the Android platform and selecting the right Android tools required extra examination. The research will also be published (in Dutch) separately as “ Orientation Document”, a mandatory step in bachelor projects at TU Delft. Kate 13