1.2 Used Methodology
The project will be executed in seven phases. In table 1 all phases are explained, together with the
documents that were the result of that phase. Although this resembles a waterfall model, the phases are
not strictly separated; a phase can start when the previous one is not finished yet. This will prohibit losing
time in the first weeks of the project when a phase takes more time than planned. To monitor the
progress, a formal meeting with the TU Delft assessor is planned weekly. A meeting with the TNO
assessor is planned once every two weeks. For the BSc. coordinator, two-weekly progress reports and a
timesheet are written.
Table 1. Defined phases of this project
Phase
Goal
Plan
Plan the project to ensure that the results
will be delivered on time
Research
Research the field to be able to create a
state of the art solution
RequireDefine the demands on the system to
ments
make sure that the right result is created
Design
Design the best possible solution
ImpleCoding to realize the solution
mentation
Testing
Test the implementation for quality
insurance
DocumenWrite documentation to enable future
ting
development and prove capability of
project group to assessors
Weeks
1
Documents
Plan of Approach
1,5
Orientation Report
1,5
Requirements Document
1
4
Design Document
Code and Javadoc
1
Test Plan and Test Results Document
1
User Manual, Developer Manual, Final
Paper, Presentation, Trac data
Plan: a proper planning will help to deliver the product at the right time. In the plan of approach,
expectations of the involved people are defined and a weekly planning with targets is listed. It contains a
list of products to be delivered. It also contains a list of dependencies the project has on resources made
available by TNO and TU Delft, like server access and work environment. The plan will have to be
approved by the assessors of TNO and TU Delft. The format of the plan is based on Prince2, a method for
project management. This phase was supposed to be executed in a week, however the document was
approved in the fifth week.
Research: trying to create a state of the art application requires a lot of research, both in the field of
Travel Time Prediction and in Mobile App making. On top of that, learning the finesses of the Android
platform and selecting the right Android tools required extra examination. The research will also be
published (in Dutch) separately as “ Orientation Document”, a mandatory step in bachelor projects at TU