Download User`s Manual Model EJA210A and EJA220A Flange
Transcript
4-2 <4. Installation> 4.4 Changing the Direction of Integral Indicator Teflon film IMPORTANT Always turn OFF power, release pressure and remove a transmitter to non-hazardous area before disassembling and reassembling an indicator. Fluorinated oil [PART No. : F9145YN] Diaphragm An integral indicator can be installed in the following three directions. Follow the instructions in section 9.4 for removing and attaching the integral indicator. Gasket area F0403.ai Figure 4.3 Integral Indicator Direction PART No. Prosess Flange size F9347XA 3 inch (80mm) F9347YD 2 inch (50mm) F0403.ai Figure 4.4 Affixing the Teflon Film 4.5 Affixing the Teflon Film IMPORTANT The FEP Teflon option includes a teflon film and fluorinated oil. Before mounting the transmitter to the process flange, affix the teflon film as follows: 1)Position the diaphragm so that the diaphragm is in a upward position. 2)Pour the fluorinated oil on the diaphragm and gasket area covering it completely and evenly. Be careful not to scratch the diaphragm or change the its shape. 3)Affix the teflon film over the diaphragm and gasket area. 4)Next, carefully inspect the cover and try to identify any entrapped air between the diaphragm and the teflon film. The air must be removed to ensure accuracy. If air pockets are present, use your fingers to remove the air by starting at the center of the diaphragm and work your way out. 5)Place the gasket with the teflon film and affix to the process flange. IM 01C21C01-01E